Loading...
02-24-1997 - Special i o 0 THE CITY OF EDGEWATER POST OFFICE BOX 100, EDGEWATER, FLORIDA 32132-0100 ,. Mayor Jack H. Hayman District 1 Councilman Danny K. Hatfield District 2 Councilwoman Louise A. Martin District 3 Councilman Michael D. Hays District 4 Councilman David L. Mitchum City Manager George E. McMahon City Attorney Krista A. Storey City Clerk Susan J.wadsworth Votina Order: Mayor Hayman Councilman Hatfield Councilwoman Martin Councilman Hays Councilman Mitchum February 19, 1997 To All Members of the City Council: I hereby call a Special Meeting of the City Council for Monday, February 24, 1997, at 7:00 p.m. in the Community Center to discuss the availability of budgeted money which can be applied to resurfacing of 30th Street/Roberts Road, and paving and drainage improvements on other roadways, such as 14th, 16th, 22nd, and 34th Streets. TTEST: ~~~- CITY CLE'K lsk Pursuant to Chapter 286, F.S., if an individual decides to appeal any decision made with respect to any matter considered at a meeting or hearing, that individual will need a record of the proceedings and will need to insure that a verbatim record of the proceedings is made. In accordance with the Americans with Disabilities Act, persons needing assistance to participate in any of these proceedings should contact Ci ty Clerk Susan Wadsworth, 904-424-2407, prior to the meeting. CITY MANAGER'S OFFICE 104 NORTH RIVERSIDE DRIVE (904)424-2404 FAX-(904)424-2409 MEMORANDUM DATE: February 20, 1997 TO: Mayor and City Council FROM: George E. McMahon, City Managers SUBJECT: Resurfacing 30th Street/Roberts Road and Paving and Drainage Improvements on other roadways, such as 14th, 16th, 22nd, and 34th Streets A special meeting has been called for Monday, February 24th, regarding the roadway improvements project and recommended change orders to permit work indicated in accordance with Kyle Fegley's February 12th memo to me (attached). I had also requested Kyle obtain costs regarding curb which could be used to bind the edge of pavement on 30th Street. That cost would be in addition to the cost indicated in Kyle's's memo and would total $75,180. I highly recommend Council approve the curb binder as it will make a substantial difference over a long period of time in preserving road improvements. Additionally, Hugh Williams and I have been looking into alternative programs for surfacing our roads. Essentially, it would involve a double course of micro - paving which has been used successfully in high traffic areas throughout the state. The use of new equipment and special leveling course make this method of micro - paving very feasible and I certainly would ask the Council to consider this as an option. We are currently obtaining cost information based on our estimates for micro - paving and will have a report on this as soon as all the information is made available. The reason this is not being presented as an option with a complete report Monday night is our City Engineer (Kyle), technical representatives of the micro - paving company, and I need to sit down and further discuss the life cycle results that we are seeking through this method. I would ask that you keep an open mind on this as an alternative and as we move through the time frame to pave the streets that you desire we will have all the information necessary to give you an informed report. You should be aware that in the current RIP project Kyle has saved and /or projected a cost savings in excess of $2,000,000 which makes the additional paving not only feasible but highly recommended. By committing this paving at this time, the City will see a substantial savings in this work compared to foregoing the paving to a future date. We will discuss this further Monday evening. Obviously, I am very pleased with the work of our City Engineer, being both well satisfied with the quantity and quality of the work he has done, as well as the major cost savings resulting from his efforts. This is extremely unusual in a paving project of this size and it is only through Kyle's diligent and prudent engineering work that this cost savings has been made possible. I ask you to join me in commending him with the highest praise for the work he has done. GEM:lsk Attachments cc: Kyle Fegley, City Engineer To: Mr. George McMahon, City Manager From: Kyle W. Fegley, City Engineer 1J . Subject: Florida Shores Roadway Improvement Project Proposed Paving Change Orders MEMOPIAMDLJM Date: February 12, 1997 As requested Halifax Paving, Inc. has submitted cost estimates to pave those east -west roadways not required to be paved under the base contract, along with overlay and drainage improvements for Roberts Road and 30th Street. I had Halifax categorize each of the modifications creating six individual changes to the contract. The attached cost breakdown itemizes each of the construction elements (i.e., earthwork, base work, etc.) within the changes and the overall costs are summarized as follows: Description Amount Change No. 1: Pave 1 4th Street from Mango Tree Drive to Willow Oak Drive Contract time extension: 21 days $78,123.50 Change No. 2: Pave 1 6th Street from Orange Tree Drive to Willow Oak Drive , Contract time extension: 21 days $7I ,855.0 Change No. 3: Pave 22nd Street from Hibiscus Drive to Willow Oak Drive Contract time extension: 37 days $!27,817.50 Change No. 4: Pave 34th Street from Umbrella Tree Drive to Victory Palm Drive and from Willow Oak Drive to Silver Palm Drive Contract time extension: 14 days 852,589.00 Change No. 5 Pave - overlay Roberts Road Contract time extension: 7 days $35,692.10 Change No. 6 Pave - over lay 30th Street $ I 0 I ,714.2 Drainage Improvements $67,551.00 Contract time extension: 14 days G L_ You will notice Halifax Paving's support documentation shows a total paving cost of only ✓ • Mr. George McMahon, City Manager Page 2 February 12, 1997 $59,817.22, for change order No. 6 and I have delineated a total cost of $ 1 01,7 1 4.22 for this work. The cost difference is affiliated with the leveling activity which at this point the quantity is unknown and without a cross - sectional survey of 30th Street at 1 -foot intervals a true estimate is difficult to grasp. Obviously we do not have the time nor money to conduct such an exhaustive survey, thus I have estimated the equivalent leveling to a I .25 -inch design mix over the entire roadway surface, and converted such to tonnage in order to derive my figure. The actual in -place quantity of asphaltic concrete leveling material will be certified through delivery tickets from the asphalt plant. Several other factors we need to keep in mind when extending the contract time are the expenditures incurred utilizing the consultants services. Quentin L. Hampton Associates, Inc. (QLH) contract will lapse in April. The current contract time for Part A is May 8, which would be extended to July 19 based on approval of all the above changes. Part B contract is currently scheduled for final completion on April 12, and with the inclusion of the above contract time extensions Part As contract remains the controlling contract regarding final completion dates. QLH has an average monthly billing approximately $19,200 thus a 72 day extension could result in as much as $45,000 extra for their fees. At this time essentially all the paving work is complete for Part B and 95 percent of the base work for Part A is finished, thus there is not as much demand for the number of inspectors and consequentially QLH could not justify $ 1 9,200 per month upon contract expiration. The materials testing firm, Professional Services Inc.'s (PSI), budget has a balance of $58,837.08 for services through January 24. With an average billing rate of $18,000 per month their original contract funds would be exhausted around May 8. I have discussed the manpower needs with PSI's vice - president and expect to reduce the number of engineering technicians on -site and obviously with Part B roadwork and Part A base work nearing completion the number of tests (i.e., nuclear gauge densities, soil cement compressive strengths, corings, etc.) will be reduced which further reduces their costs. I am hoping to stretch PSI's services beyond the May 8 date within the original budget (NOTE: Part A contract has already been extended 127 days without an increase in PSI's contract), but probably will incur additional expenses if the roadway change orders are approved. What I would like to do if possible is receive Council approval to compensate QLH and PSI those costs incurred above and beyond the original contracts based on hourly rates and unit cost for testing procedures. These costs are difficult to define and may vary depending on Halifax's productivity. The maximum amount of additional funds necessary to inspect and test all the forementioned change order items would be approximately $78,000. Of course if Council elects to choose only a select number of the changes (i.e., only Roberts Road for instance), these would have to be evaluated on an individual basis to determine the impact on the project's budget. • Mr. George McMahon, City Manager Page 3 February 12, 1997 As 1 have previously indicated the costs and anticipated expenditures for the project changes, I will summarize the budget and remaining funds to date for evaluation in determining the feasibility to approve the proposed change order items. The Part B contract which incorporates the portion of Florida Shores north of SR 442 was let for a contract amount of S2,505,045. Through January the total amount of expenditures was $1,879,936.13. The remaining field work generally includes minor earthwork, drainage, and sodding west of the railroad tracks and similar work east of the railroad tracks including 2,000 lineal feet of asphalt paving. In review of the contract unit prices versus the remaining quantities of work, the maximum amount of contract work remaining equals approximately $77,000. At this stage of the project I am very confident Part B contract will be approximately $548,000 below the original contract amount. In Part A the City has accepted four of the seven phases as substantially complete, therefore the construction cost within these boundaries is known and will not increase. The remaining three phases are in different increments of progress, thus I do not have the tight grasp of proposed versus actual costs as I do in Part B. The phases we have accepted to date have come in under budget in excess of $600,000. As project administrator the factors involved with the remaining phases and the respective elements of each phase I anticipate Part A contract will be in excess of I million dollars below the original contract amount. Also, as you are aware the City in expectation of contract changes, delays, cost overruns, and project complications budgeted $500,000 in contingency funds. The City has not spent one dime of the contingency funds to date. In conclusion the total funds necessary to pave the remaining east -west roadways and overlay Roberts Road and 30th Street including testing and inspections is approximately $610,342. Unspent contingency funds and expected base contract savings are in excess of $2,000,000, therefore it is feasible monetarily to pursue all six change order items and remain within the original roadway and drainage improvement project budget. Halifax no longer has the need to retain as much of their heavy equipment and crews on site for contractual work, and request a decision be made as soon as possible regarding the potential changes. Based on your review and acknowledgment I would like to move ahead with an agenda request for the next Council meeting to incorporate the proposed changes. KWF:rsm attachments • PHONE (904) 676 -0200 41,1_ _ � r iN FAX (904) 676 -0803 T -0 �t • Halifax Paving, Inc. P.O. BOX 730549 - ORMOND BEACH, FL 32173 -0549 860 HULL ROAD, ORMOND BEACH, FL 32174 February 7, 1997 Mr. Kyle Fegley City of Edgewater RE: Florida Shores Roadway and Drainage Improvement Project 14th Street 1. Grading 2,447 LF @ $ 15.50 = $ 37,928.50 2. Asphalt 1 1/4" Type 1 5,500 SY @ $ 2.85 = $ 15,675.00 3. 6" Crushed Concrete 5,800 SY @ $ 4.00 = $ 23,200.00 4. Sod 1,100 SY @ $ 1.20 = $ 1,320.00 t6 ----° n TOTAL = $ 78,123.50 Contract Time Extension: Days 16th Street 1. Grading 1,950 LF @ $ 15.50 = $ 30,225.00 2. Asphalt 1 1/4" Type 1 4,600 SY @ $ 2.85 = $ 13,110.00 3. 6" Crushed Concrete 4,900 SY @ $ 4.00 = $ 19,600.00 4. Sod 6,100 SY @ $ 1.20 = $ 7,320.00 5. Ditch Checks 4 EA @ $400.00 = $ 1,600.00 � TOTAL = $ 71, 855.00 ,2l I Contract Time Extension: >4 22nd Street 1. Grading 4,000 LF @ $ 15.50 = $ 62,000.00 2. Asphalt 1 1/4" Type 1 8,750 SY @ $ 2.85 = $ 24,937.50 3. 6" Crushed Concrete 9,200 SY @ $ 4.00 = $ 36,800.00 4. Sod 900 SY @ $ 1.20 = $ 1,080.00 TOTAL = $124,817.50 Contract Time Extension: Days / • , j PHONE (904) 676 -0200 1 ��1 FAX (904) 676-0803 i � V Halifax Paving, Inc. P.O. BOX 730549 - ORMOND BEACH, FL 32173 -0549 860 HULL ROAD, ORMOND BEACH, FL 32174 Page 2 Feb. 7, 1997 34th Street 1. Grading 1,648 LF @ $ 15.50 = $ 25,544.00 2. Asphalt 1 1/4" Type 1 3,700 SY @ $ 2.85 = $ 10,545.00 3. 6" Crushed Concrete 3,900 SY @ $ ,.4 :00 = $ 15,600.00 4. Sod 750 SY @ $ 1.20 = $ 900.00 TOTAL = $ 52,589.00 Contract Time Extension: 14 Days Roberti Road 1. 1" Overlay 11,166 SY @ $ 2.65 = $ 29,589.90 2. Striping 1 LS @ $5357.20 = $ 5,357.20 3. Maint. of Traffic 1 LS @ $750.00 = $ 750.00 TOTAL = $ 35, 692.10 Contract Time Extension: ) Days 30th Street 1. Leveling TN @ $ 41.00 = $ 2. 1" Overlay 16,350 SY @ $ 2.65 = $ 43,327.50 3. E.O.P. Repair 610 SY @ $ 10.00 = $ 6,100.00 4. Striping 1 LS @ $2439.72 = $ 2,439.72 5. Grading 1 LS @ $5000.00 = $ 5,000.00 6. Sod 1,000 SY @ $ 1.20 = $ 1,200.00 7. Maint. of Traffic 1 LS @ $1750.00 = $ 1,750.00 TOTAL NOT INCLUDING LEVELING = $ 59,817.22 Contract Time Extension: y s 02/07/97 13:24 CITY OF EDGEWATER b161 To: Tommy Durrance A(SIMIL{ Fax #: 676 -0803 Date: February 7, 1997 Pages: Three, including this cover sheet. In accordance with our recent conversation regarding the proposed paving changes, I have amended your proposal to reflect the agreed to unit price of grading and crushed concrete. I have also implemented the time frame needed to implement the individual changes. Please initial each of the changes as I have done and forward to my office, or if you desire a cleaner document reissue the proposal with the amendments. Thank you for your cooperation. KWF:rsm From the desit of,.. Kyle W. Fegley, P.E. Crly Engineer City of Edgewater P.O. Box 100 Edgewater, Fl 32132 -0100 (904)424 -2479 Fax: (904)424 -2409 • FEB -07 -1997 13:24 96% P.01 U L5:25 L I I Y Ut bt.WH I L, �m. r t PHONE (904) 676.0200 t ! 4 ' , I FAX (904) 676 -0803 1 1 4• = .1.w \•h V Y/ . Halifax Paving, Inc. P.O. BOX 730549-ORMOND BEACH, FL 32173 -0649 860 HULL ROAD, ORMOND BEACH, FL 32174 February 4, 1997 Mr. Kyle Fegley City of Edgewater RE: Florida Shores 14th Street 1. Grading 2,447 LF @ 16.50 l‘.‘ $ 4 0,375.50 3t`128. -'`' C 2. Asphalt 1 1/4" Type I 5,500 SY @ 2.85 , $- 15,675.00 1 3. 6" Crushed Conon:tc 5,800 SY @ #. *AO z6'3'} �'� 2,3, 4. Sod 1,100 SY @ 1.20 1,320.00 C , -,VT,', 0-4. 6 .44eAt� : i4 d A 7 s TOTAL $ e 9'9 :-`3C g, l23` C° I ¢ 16th Street Yrr' 3p -2.2 ° 1. Grading 1,950 LF @ 16.50 16• $ 32,175.00 I 2. Asphalt 1 1/4" Type I 4,600 SY @ 2.85 y j 13,110.00 3. 6" Crushed Concrete 4,900 SY @ -4rr58- 4.00 V C.p° .00 4. Sod 6,100 SY @ 1.20 7,320.00 1 L 5. Ditch checks 4 EA @400.00 1,600.00 (p -( i- T' Cickf,.s6; t4- 4 -1> < TOTAL $ 76, 255.00 � fot0O 22nd Street 1. Grading 4,000 LF @ 16.50 16 $ G,000.00 6 17,- 2. Asphalt 1 1/4" Type I 8,750 SY @ 2.85 24,937.50 3. 6" Crushed Concrete 9,200 SY @ 4.50 4,0D A1 X00.00 • 36/i3c> ?- 4. Sod 900 SY @ 1.20 1,080.00 (4) C r EY. ;t.v.: Pi d"y5 TOTAL $139, 4 17 .50 124 8l�.Sa 34th Street C r 4c" 1. Grading 1,648 LF @ 1-&1-54 &. 0 5 • $ 2 8 2. Asphalt 1 1/4" Type I 3,700 SY @ 2.85 v , • ,f 10,545.00 1 3. 6" Crushed Concrete 3,900 SY @ 4.50 4.0° 17,550.00 /5,6�' 4. Sod 750 SY @ 1.20 900.00 ►4 Co,,.-iv 1;wt E : I TOTAL $ 56,107.00 5 587.00 1 1 r FEB -07 -1997 13:24 96% P.02 6G/Ur/7( 1.�: GU U l I T Ur CUUCWr 1 =17 ✓�u,� Mr. Kyle Fegley City of Edgewater February 4, 1997 Page 2 of 2 Roberts Road 1. 1" Overlay 11,166 SY @ 2.65 $ 29,589.90 2. Striping 1 LS @ 5,357.20 5,357.20 , 3. Maint. of Traffic 1 LS @ 750.00 750.00 (`13 r �\.,e E ups 1^ = 14 1 , s r TOTAL $ 35,692.10 Op 30th Street 1. Leveling TN @ 41 $ 2. 1" Overlay 16,350 SY @ 65 43,327.50 3. E.O.P. Repair 610 SY @ 10.00 6,100.00 4. Striping 1 LS @ 2,439.72 2,439.72 5. Grading 1 LS @ 5,000.00 5,000.00 6. Sod 1,000 SY @ 1.20 1,200.00 a 7. Maint. of Traffic I 1 LS @ 3,750.00 1,750.00 `T OTAL NOT INCLUDING LEVELING $ 59,817.22 FEB -87 -1997 13:25 95% P.83 02/04/97 10:03 FAX 904 7 2204 vUL nttLLrtt. rnrii•u VOLUSIA CONSTRCI CTION COMPANY, INC. UNDERGROUND UTIL■T1ES February 04, 1997 Page 1 of 2 To Halifax Paving, Inc. Post Office Box 730549 Ormond Beach, Florida 32173 -0549 Attn: Tyler Kirton FLORIDA SHORES ROADWAY IMPROVEMENTS CHANGE ORDER G = G A. ROBERTS ROAD (34TH STREET) 1. Drainage Pipe a. 12" CPP 13 LF 18.00 234,00 b. 15" RCP 790 LF 20.50 16195.00 c. 18" RCP 492 LF 21,00 10332.00 d. 12" x 18" ERCP 75 LF 21.00 1575.00 e. 14" x 23" ERCP 210 LF 23.60 4956.00 2, Inlets a. Type "C" 6 EA 1100.00 6600.00 3. Concrete Jacket For 18" Concrete Pipe 4 EA 390.00 1560.00 4, Additional Rip Rap Headwall Wings 20 CY 205.00 4100.00 5. Expose Existing Utilities 1 LS 750.00 750.00 6. Open Cut and Repair a, Asphalt Pavement 85 SY 25.00 2125.00 b. Concrete Drive (2) 62 SY 20.00 1240.00 952 BIG TPEE ROAD • P.O. Box 457E . SOUTH OAYTONA, FL 02121 . 90 -61 1 1 DUN & BPADS - rREEr 06.786 -3225 FEB -04 - 1997 09:08 904 756 2204 97% P.01 02/04/97 1U:03 MA yU4 /JO LLU4 VUL l,U1VJ11(U111V1v -.-. nyi.irn.1 rnyiwv 2 of 2 7, Maintenance of Traffic 1 LS 2500.00 2500.00 8. Imported Fill 1250 CY 6,00 7500.00 9. Sod 3300 SY 1.20 3960.00 SUB TOTAL: $63627.00 B. 22ND STREET 1. Drain Pipe a. 12" x 18" RCP 144 LF 21.00 3024.00 2. Open Cut and Repair Asphalt Pavement 36 SY 25.00 900.00 SUB TOTAL: 53924,00 GRAND TOTAL: $67551.00 NOTES: 1. All utility adjustments required due to conflicts with proposed drainage improvements will be performed by City forces, and at no expense to the contractor. Signed: Date; Tyler Kirton Halifax Paving, Inc. Signed — Date: Rohie Bledsoe, President Volusia Construction Co., Inc. FEB -04 -1997 09.08 904 756 2204 96% P.02 To: Mr. George McMahon, City Manager From: Kyle W. Fegley, City Engineer Subject: Florida Shores Roadway Improvement Project F E -IVED 30th Street Confinement Curbs MEMORANDUM Rec . t ) 199/ CITY MANAGER Date: February 19, 1997 As a supplement to my February 12 memorandum regarding paving costs for six potential changes to the Florida Shores Roadway Improvement Project, I have obtained a verbal unit price for the environmental curb from Halifax Paving, Inc. The environmental curb does not have an invert and simply is an extension of the roadway profile, thus extends the roadway 1 foot either edge of the pavement. The face of the curb has a depth of 7 inches. This curb which would confine the edge of pavement, thus reducing lateral movement and premature rutting or shoving, is desired for 30th Street only or approximately 6,265 lft. At $6 per lineal foot tra'el lane of $12 lft /cross - section, the cost to construct the curbing would be approximately $7S 5' 18 KWF:rsm •