06-12-2007 - Guava Drive & 20th Street WarehouseSP 0708
Guava Drive and 20 - Warehouse
TRC Minutes 6/12/07
IN ATTENDANCE:
Jill Danigel — Fire Marshal
Joe Roberts — Project Manager
Mark White — Whites Construction
Terry Wadsorth — CoE DOES
Pat Drosten — CoE — Planning
Dennis Fischer — CoE — Building Offical
Planning Department
1. The plan does not reflect the required (Section 21 Table V-1) 50' buffer
from the residential use to the rear (east) of the property. Please revise or
apply for a variance from this requirement.
Buildings must he joined and not encroach any further into the setback to eliminate
variance requirement.
2. Indicate height of the building as measured from the crown of the nearest
roadway.
OK
3. Indicate any proposed signage.
None proposed at this time
4. Indicate location of any adjacent driveways on both the east and west sides of
Guava Drive.
Will respond
5. In the event ownership of the entire building transfers to individual owners,
a joint use driveway agreement is required.
OK
6. Reconfigure the handicap parking space to a north-south orientation to
provide for easier access.
Will respond
7. Angled parking (in lieu of 90° shown on plan) is recommended. Current plan
has inadequate aisle width as required by Section 21- 57.02, Table V
Will respond
8. Indicate eventual stormwater outfall to a public conveyance system.
Will respond
9. Provide elevation on the west side of the north invert.
Will respond
10. Landscape plan must provide legend indicating type, size and count of trees
and shrubs. Provide information on the "glossy trivet" plant shown on the
plans.
Will clarify
11. Landscape plan must include the following language from Section 21-54.02
(c) "All plant materials used in conformance with the requirements of this
Section shall be Florida grade #1, as established, and periodically revised by
the Florida Department of Agriculture and Consumer Affairs ".
Will re vise
12. Buffer yard landscaping requirements cannot be determined until site
redesigned or variance granted to address the 50' setback requirement.
M will cheek with Darren on these requirements
Building Department (the following items to be included with building permit
application)
1. All buildings constructed after January 25, 2007 shall have glass protection
per FBC 1606.9.1.4.
OK
2. Construction drawings shall comply with the 2004 Florida Building Code
with the 2006 revisions and the National Electric Code, Edition 2005.
OK
3. Tenant separation for storage or vehicle occupancy must be 2 hour firewalls.
OK
4. Provide steel building manufacturer drawings for permitting.
OK
5. Provide walk outdoor and roll up door approval numbers and installation
sheets.
OK
Environmental Services Department
1. Although the site plan application references a dumpster pad, one is not
shown on the plans. A dumpster pad and enclosure are required.
Will revise
2. The handicap sign fine should read $150.00.
Will re vise
3. Indicate location of closest fire hydrant on the plan (across the street from
this parcel on Guava Drive).
Will re vise
4. There should be an existing sewer service for the existing building. Please
verify location and connect new buildings to same service.
Will revise
Legal Department
1. The O &E has no exhibits attached. The O &E is not complete without these
items and must be provided.
Will respond
Engineer (Quentin L. Hampton Associates)
1. The plans should include a note stating, "All construction shall be in
conformance with the City of Edgewater Land Development Code and
Standard Construction Details, Latest Version, unless otherwise specifically
approved ".
OK
2. All disturbed pervious areas should be sodded and pertinent notes added to
site plan.
OK
3. Since this is an existing building, it is assumed water service is in compliance
with City Standards. Please confirm.
OK
4. In accordance with the Land Development Code, non-residential sewer
service line should be 6" diameter minimum. Plans should show connection
with approximate location to the City's sewer system and City's construction
standard details added to plans.
This item OKper Terry Wadsworth
5. Due to the fact that 11,030 square feet of impervious service is proposed, a
SJRWMD permit is required.
Applied for
6. The roof drainage should be routed to the stormwater treatment system.
OK
Fire Department
1. The required fire flow for this project is 1500 gallons per minute.
OK
These comments are intended to comply with City of Edgewater Land Development
regulations, FDOT standard specifications and sound engineering practices, and are not
meant to be inclusive of all errors or omissions. The engineer of record is solely responsible
for technical accuracy, engineering judgment, and quality of work.
While every effort is made to assure that projects reviewed by this office comply with all
applicable codes and standards, we do not certify or guarantee that they do. It is the
responsibility of the applicant to assure compliance with all applicable codes and standards
prior to the project being issued a certificate of occupancy.