Loading...
07-10-2007 - Bella Vista Baptist ChurchSP 0711— Belle Vista Baptist Church TRC Minutes 7/10/07 IN ATTENDANCE Meeting cancelled at applicants request (Bob Howard) Comments will be addressed in resubmitted plans. Planning Department 1. The existing zoning classification for this property is Public /Semi-Public not B-3 as shown on the plan. Revise accordingly. 2. Curbing must be provided around the perimeter of the new parking area. Wheelstops are not permitted. 3. Revise landscape plan to indicate a 24" height for all shrubs and 2 %2 caliper at 6" above the soil line for trees. Building Department 1. All buildings constructed after January 25, 2007 shall have glass protection per FBC 1606.9.1.4. 2. Construction drawings shall comply with the 2004 Florida Building Code with the 2006 revisions and National Electric Code, Edition 2005. 3. Construction review comments will be provided during the building permit process. Environmental Services 1. Per the Land Development Code, wheel stops are not allowed unless stormwater design warrants their use. Please provide justification or remove from the site plan. 2. Paving and Grading Note #5 should read that all disturbed areas must be sodded. Seed and mulch are not acceptable. 3. The cross section on the ditch shows a bottom elevation of 22.0. This should be 21.5. 4. The Erosion and Sedimentation Control Plan is too small to read. This should be shown on a separate sheet. 5. Sufficient dumpster or refuse containers shall be provided during construction. 6. The existing water service is 1" not %" as represented on the Water/Wastewater application for service. Engineer (Quentin L. Hampton Associates) 1. The plans should include a note stating "All construction shall be in conformance with the City of Edgewater Land Development Code and Standard Construction Details, Latest Version, unless otherwise specifically approved ". 2. Paving and grading notes make reference to Seminole County. Revise to reflect Volusia County. 3. FDOT stop sign and pavement bar should be provided at driveway connection with US 1. 4. Since this is an existing building, it assumed that the utilities are in compliance with City Standards. Please clarify. 5. Wheel stops should be provided at grass parking spaces. Fire Department 1. The required fire flow for this project is 1500 gallons per minute. These comments are intended to comply with City of Edgewater Land Development regulations, MOT standard specifications and sound engineering practices, and are not meant to be inclusive of all errors or omissions. The engineer of record is solely responsible for technical accuracy, engineering judgment, and quality of work. While every effort is made to assure that projects reviewed by this office comply with all applicable codes and standards, we do not certify or guarantee that they do. It is the responsibility of the applicant to assure compliance with all applicable codes and standards prior to the project being issued a certificate of occupancy.