Loading...
05-08-2007 - Harshaw Allstate OfficeHarshaw Allstate Office SP 0706 — TRC Minutes May 8, 2007 IN ATTENDANCE: Planning Department 1. Wheelstops are not permitted per Section 21 Will respond 2. All landscaped areas shall be curbed per Section 21-54.03(b). Will respond 3. Signage must conform to standards set forth in Section 21.450.02. Variance hearing regarding this issue is scheduled for May 9, 2007 4. Trees shall be planted at 21/2" caliper at 6" above the ground per Section 21- 55.02(b). OK 5. Shrubs shall be planted at 24" in height per Section 21-54.02(e). OK 6. Clarify if a live oak is proposed along the eastern property line not the proposed new driveway. If so, this will raise the live oak count to six. OK 7. All tree plantings shall be replaced if they die within two (2) years per Section 21-55.03(d). Revise note #22 of the landscape plan. OK Building Department 1. Comments will be provided at the Technical Review Committee meeting scheduled for May 8, 2007 at 2 :00 PM. Will contact Dennis directly Environmental Services 1. On Page 1 of the dimension plan under General Notes — the Water /Sewer Service provider is the City of Edgewater, not the City of Daytona Beach. OK 2. On Page 2 of the dimension plan, the irrigation meter will be connected to the reclaimed water system. OK 3. The nearest fire hydrant is located on the southeast corner of SR 442 and Orange Tree Drive. Will indicate Engineer (Quentin L. Hampton Associates) 1. The plans should include a note stating "All construction shall be in conformance with the City of Edgewater Land Development Code and Standard Construction Details, Latest Edition, unless specifically approved." OK 2. All disturbed pervious areas should be sodded and pertinent notes added to plans. OK 3. Since this is an existing building, it is assumed that Utilities are in compliance with City Standards. OK 4. Although the proposed driveway does not comply with minimum distance to the intersection with SR 442 per Section 21-52.02 (c), it seems to be an adequate alternative has been provided considering that this is an existing building and the preservation of trees in the subject parcel. OK Fire Department 1. The required fire flow for this project is 1500 gallons per minute. OK Legal Department 1. The O &E does not have exhibits (items listed under encumbrances, judgments & liens of record) attached. All legal department issues have been addressed Once the above mentioned is clarified, the Legal Department would approve pursuant to the following: 1. no encroachments into any setback/easement areas; 2. if there is a mortgage holder, mortgage holder will need to execute joiner or letter of authorization if property is encumbered; 3. compliance with all City, County, State and Federal requirements, including the City of Edgewater's Code of Ordinances and Land Development Code. These comments are intended to comply with City of Edgewater Land Development regulations, FDOT standard specifications and sound engineering practices, and are not meant to be inclusive of all errors or omissions. The engineer of record is solely responsible for technical accuracy, engineering judgment, and quality of work. While every effort is made to assure that projects reviewed by this office comply with all applicable codes and standards, we do not certify or guarantee that they do. It is the responsibility of the applicant to assure compliance with all applicable codes and standards prior to the project being issued a certificate of occupancy.