01-09-2002 - Edgewater Borrow PitEDGEWATER BORROW PIT COMMENTS TRC MEETING 01/09/02 IN ATTENDANCE: Tracy Barlow, Fire Chief Dennis Fischer, Building Director Robin Matusick, Legal Assistant Hans Wolfer, P.E., City Engineer Glenn Storch, Attorney for applicant Darren Lear, Chief Planner Pat Drosten, Planning Technician Sue Harpster - Littrell, P.E., applicant Planning Department • A reclamation plan plus a performance bond in an amount determined by the City shall be submitted as part of the application. At a minimum, the plan shall include: 1. A statement of planned reclamation, including the methods to accomplish reclamation as well as the phasing and timing of reclamation. 2. The method of disposing of any equipment or structure used in the excavation operation. 3. A plan setting forth the final grade of the excavation, any water features included in the reclamation, proposed methods to prevent stagnation and pollution, landscaping or vegetative planning and areas of cut or fill. Some of this information was included in the Site and System Design Information sheet submitted with this site plan. Response will be made to additional information. • A timing cost estimate shall accompany the reclamation plan as well. Will be provided. • Traffic pattern flow must be shown on the site plan as well as the estimated number of trips. This was submitted to FDOT, Permit will be submitted when received. • A maintenance bond for street repairs shall be posted as a part of the application. This is required by FDOT, Will supply copy. A two -year permit shall be issued and is renewable if the project is found to be in compliance. OK • The applicant must acquire all SJRWD and FDOT permits prior to City Council approval. An FDOT permit for use of its drainage systems must be granted as well. These have been submitted. Per Mr. Storch, they would like to have this as a condition of Development Order. *Darren will call Sue back about this. • Provide proof of the ownership and maintenance responsibilities for the existing drainage ditch which is to receive the discharge. Sue has been unable to find ownership, Darren suggested calling Volusia County Mosquito Control. Sue will follow up. • Provide a dust and noise mitigation plan. This plan shall include a daily watering schedule contingent on prevailing weather conditions Will submit as such, this was covered in the Info sheet. • The hours of operation should be modified for the northern phase of this project, which is adjacent to the Magnolias Subdivision. The operating schedule must be set to reflect the variation between standard and daylight savings time. C. U. Permit was granted with condition of hours of 7 a. m. to 7 p. m., The City is in the process of adopting a new Ordinance to address noise. Statement will be made to reflect intent of hours of operation being from dusk till dawn. • Any specimen trees to be removed must be indicated on the site plan. It was agreed to show general areas and number of trees. Trees will be flagged and Planning Department will verify trees to be removed. • Future residential development of the property shall require a minimum 60' Right - of -way per Section 21- 169.03(b) of the City Land Development Code. PUD Agreement will address this. Building Department • If the property is to be developed into future residential home site I suggest the excavation stop at 150 feet from the road edge. PUD Agreement will address this. Environmental Services • The excavation parameters are consistent with earlier discussions held at the pre - application meeting for this project specifically the 12' excavation limit for the ponds so they will meet the necessary criteria for stormwater retention and treatment. OK. Fire Department • No comments are offered at this time. Legal Department • No comments City Eneineer • Number all sheets consecutively, including the cover sheet. OK. OK. A pre - construction meeting is required. • Sheet 1 of 11 has area codes in error. C� OK. • Need match line on Sheets 2 and 3. • Temporary berm to be 5 -foot minimum. Hans and Sue will meet together to discuss this item. • Drainage Control Structure #1 need complete specification on fasteners. OK. • The Storm Water Management System must be computed for a 25 -year, 24 -hour storm. Computations indicate 5.0 inches of rainfall, in lieu of 9.0 inches. OK Hans and Sue will meet together to discuss this item. Written response to these comments are required with submittal of seven (7) sets of revised Site Plans. While every effort is made to assure that projects reviewed by this office comply with all applicable codes and standards, we do not certify or guarantee that they do. It is the responsibility of the applicant to assure compliance with all applicable codes and standards prior to the project being issued a certificate of occupancy