Loading...
02-24-2004 - D & G Holdings - Steelmaster Industries Inc - 28th Street & Hibiscus DriveD & G Holdings Steelmaster Industries Inc. 28`' Street & Hibiscus Drive SP -0403 TRC MEETING 2/24/04 PLANNING DEPARTMENT GENERAL 1. Building height not shown on site plan, indicate on revised plans. 2. SJRWMD permit required. 3. If signage is proposed, show details. 4. The project is located on two separate parcels. Combine parcels and address on revised plans. 5. Show that driveway shall line up with existing driveway across the street. STORMWATER 6. Show water flow and runoff on plan (outfall). Outfall must drain to some sort of public conveyance. 7. Is it possible to pipe overflow to the 28 St. drainage? 8. Demonstrate some effort to show stormwater system can handle flow. LANDSCAPING 9. Specimen tree removal must be indicated on landscape plans and a permit obtained. 10. Landscape plans must indicate "All plant materials used in conformance with the requirements of this Section shall be Florida grade #1, as established, and periodically revised by the Florida Department of Agriculture and Consumer Affairs. (21- 54.02(c)). G: \TRC_PRE- APP \Minutes \2004 \SP -0403 - D & G Holdings -.doc 1 11. Total number of shrubs required is 297, this requirement is the lineal feet of lot perimeter divided by 3 (892/3), per Section 21- 54.02(e) of the Land Development Code. 12. Show replacement tree dimensions in planting schedule. 13. Add note that all disturbed areas of the lot shall be sodded prior to issuance of Certificate of Occupancy. (21- 54.02(f)). 14. Landscaped areas shall be protected from vehicular encroachment with effective curbs. Wheel stops are permitted only when certain stormwater system conditions warrant their use. (21- 54.03(b)). 15. A Class C landscape buffer is required in the southernmost 120' of the western portion (rear) of the property. (Abutting residential use). A 50 -foot buffer would require 4 trees and 36 shrubs. These can be considered in the overall site tree /shrub count. Please call out buffer area on plans and show planting details. 16. Note on plans that minimum tree protection standards shall be met and provide details where required. 17. Show irrigation plan. DRIVEWAY /ACCESS 18. Sidewalks are required (21- 52.04). (May pay into the City's Pedestrian System Development Fund). PARKING 9. Fifteen- foot maneuver depth/radius is required. (21- 57.02). BUILDING DEPARTMENT 1. No floor plans submitted, therefore, was unable to review the location of second means of egress. The location of the retention pond may interfere with these exits. 2. Construction drawings shall comply with all Florida Building Code 2001 with 2003 revisions for 120 mph wind speed within the impact debris region. G: \TRC_PRE- APP \Minutes \2004 \SP -0403 - D & G Holdings -.doc 2 FIRE DEPARTMENT 1. The required fire flow for this project is 1250 gallons per minute. LEGAL DEPARTMENT The developer shall meet all Federal, State and City statutory requirements and maintain compliance with the City Code of Ordinances along with the Land Development to proceed with their project. ENVIRONMENTAL SERVICE DEPARTMENT STORMWATER — Stormwater review to be done by City Engineer. Placement of silt fencing around the property during construction is required and should be shown on the plans. An NPDES Construction Permit from the Florida Department of Environmental Protection will be required. Copy of NOI is to be furnished to the Planning Department. All construction is to be done according to the City of Edgewater's Standard Construction Details. CITY ENGINEEER - QHA, INC — DAVID KING 1. Applicable City Standard (utility) Construction Details should be incorporated in the site plan. Utilities (Section 21 -51). 2. A copy of the soil boring report should be provided to the City. Stormwater Mana eg ment Requirements (Section 21 -55). 3. It is recommended that the overflow weir be moved adjacent to the property line so to limit the possibility of City drainage "back up" onto this property in the swale. Stormwater Management Requirements (Section 21 -55) Contact our office if you have any questions. These comments are intended to comply with City of Edgewater Land Development regulations, FDOT standard specifications and sound engineering practices, and are not meant to be inclusive of all errors or omissions. The engineer of record is solely responsible for technical accuracy, engineering judgment, and quality of work. G: \TRC — PRE- APP \Minutes \2004 \SP -0403 - D & G Holdings -.doc While every effort is made to assure that projects reviewed by this office comply with all applicable codes and standards, we do not certify or guarantee that they do. It is the responsibility of the applicant to assure compliance with all applicable codes and standards prior to the project being issued a certificate of occupancy. G: \TRC_PRE- APP \Minutes \2004 \SP -0403 - D & G Holdings -.doc 4