01-06-2005 - Edgewater Harbor Phase 1SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
IN ATTENDANCE:
Planning Department
All sections referenced are from the May 2003 edition of the City of Edgewater, Land
Development Code.
General
1. Back up /emergency power is required for the lift station and shall be dedicated to
the City of Edgewater.
Separate generators for the lift station will be provided and dedicated to the City.
2. On sheet #1 in the "Roadway and Parking Areas" section (first line), the word
"installation" is mis- spelled.
Will correct.
3. Note #1 on Sheet #1 — Per Section 21 -54.02 (f) sod shall be used in all road right
of ways.
OK
4. Note #2 on Sheet #1 —Provide a copy of the soils testing.
Will provide.
5. Notes #3, 4 and 5 on Sheet #1 — All street construction shall conform to Section
21 -52.05 "street design standards" from the City of Edgewater Land Development
Code.
Will revise note.
6. Per Edgewater Harbor PUD agreement, the road right of way shall be a minimum
of eighty (80) feet.
Revisions to the PUD agreement will be taken to City Council regarding this and other
matters.
7. If all right of ways are to be dedicated to the public, then the PUD agreement
must be revised accordingly.
Revisions to the PUD agreement will be taken to City Council regarding this and other
matters.
8. Indicate street light locations.
Will provide a letter of agreement and scope of work with Florida Power and Light
describing this.
9. Provide notes section that includes, but is not limited to, total square footage,
height (not to exceed 95 feet per the PUD agreement), impervious surface area
ratio, building coverage, etc.
Will add notes on page C- ]A.
10. Indicate building setbacks per PUD agreement.
Will show on revised site plan.
11. Show proposed signage location and sizes.
Revisions to the PUD agreement will be taken to City Council regarding this and other
matters.. Will make reference to this matter on revised site plan.
12. Provide copies of all applicable association documents.
Will provide condo documents prior to plat approval.
** Questions arose regarding platting of this parcel. This will occur after site plan
approval. * **
SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
13. All impact fees shall be paid in accordance with the PUD agreement.
Katie, Danny, Jill and Ken will discuss this matter.
14. Indicate the recreational jogging path (and type of surface) per the PUD
agreement along the length of Edgewater Harbor Boulevard.
Will show connectivity.
15. Indicate at what phase the recreation facility is to be constructed.
This will occur in Phase H. Some revision to original master plan may occur which may
be addressed in revisions to the PUD agreement, which will be taken to City Council
regarding this and other matters.
16. Provide the following permits or letters of exemption:
• Florida Department of Transportation
• Department of Environmental Protection
• Department of Health and Rehabilitative Services
• St. Johns River Water Management District
• Army Corps of Engineers
• Florida Fish and Wildlife Conservation Commission
OK
17. Provide copies of the following documents:
• Environmental impact analysis
• Threatened and endangered species report, including gopher tortoise
survey.
OK
18. Per Section 21 -53.08 (e) "all areas and/or structures to be maintained by the City
must be dedicated to the City by plat or separate instrument and accepted by the
City Council upon a recommendation from the City Engineer and Planner ".
OK
19. Indicate fencing around the proposed swimming pool per Section 7 -325 of the
City of Edgewater Code of Ordinances.
OK. Will call out. Plans regarding fencing will checked with Volusia County Health
Department regarding location of fencing.
Parking
1. 121 parking spaces are required per building. Indicate these totals on the revised
site plan.
Will show on revised site plan.
2. Indicate aisle width within parking structures.
Will show on revised site plan.
3. Provide information regarding the security gates, including emergency
ingress /egress features.
Will provide note stating they will comply with applicable codes. Will coordinate this
with Jill.
4. All parking spaces shall have a minimum of fifteen (15) feet maneuver depth and
radius per Table V -7.
Will show on revised site plan.
5. Indicate the emergency access from US 1 per the PUD Agreement, if applicable.
N/A
SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
Landscaping
1. Provide a landscaping and irrigation plan. Applicant is advised to contact the
Volusia County Health Department regarding the new countywide "water wise
landscaping" ordinance.
OK
2. Per Section 21 -55.05 of the Land Development Code, historic trees shall be
removed only upon approval of the City Council.
OK
3. Volusia County Minimum Tree Protection Standards require at least fifteen (15)
percent of the square footage of any development shall be designated for the
protection of trees.
OK
4. Indicate the total number of existing specimen trees per Section 21 -55.06 and 21-
55.07 of the Land Development Code to establish conformance with minimum
specimen tree protection.
OK
5. Per Section 21 -41.04 of the Land Development Code, a minimum buffer of fifty
feet (50') upland from the mean high water line and a minimum of twenty five
feet (25') from the wetland boundary shall be established adjacent to and
surrounding all wetlands.
OK
Building Department
Comments to be provided at the Technical Review Committee meeting.
Fire - Rescue Department
1. Section 21- 240.01 (b) requires "except as provided herein, all water mains serving
fire hydrants shall be looped ". There are three provisions for non - looped water
mains are provided in Section 21- 240.01 (c) — indicate if any of these are
applicable to this project.
OK as is.
2. Indicate fire hydrant locations on the overall site plan.
Will call out.
3. A hydrant is needed between the two buildings in the area of the pond per Section
21- 250.04 (b).
OK
4. A hydrant should be at least fifty feet (50') away from each structure per Section
21- 250.04 (d).
OK
5. Fire department connections for the fire sprinkler systems should be placed out of
range of the collapse zone of each building — for example, near the hydrants at the
street.
OK
6. Fire hydrants shall be painted and marked in accordance with City specifications.
OK
SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
7. The required fire flow for each building is 2500 gallons per minute per building.
Flow test showed 1700 gallons l per minute. Per Ken as long flow is adequate for
sprinkler system this is ok.
8. Phase I road construction brings the eventual looping road of Edgewater Harbor
Boulevard to a dead end. Indicate what provisions will be made for emergency
vehicle turn around maneuvers.
OK Will show. Plans to provide shell packed construction emergency access during
development phase.
City engineer (David King — Quentin L. Hampton, Associates, Inc.)
Resource Protection
1. Wetlands buffers per Section 21 -41.04 should be shown.
OK
2. A copy of the gopher tortoise- taking permit should be provided to the City.
Will provide.
Utilities
1. The proposed gravity sewer slopes do not meet the City's standards (note 4).
Per Terry, as long as they meet velocity spec's this is ok.
2. A 12" valve on the north branch of the twelve inch (12 ") tee /Wye at the entrance
fountain may be desirable.
OK. Will show.
3. Additional information on the proposed lift station (pump size, cycle times, etc.)
should be provided for review.
Design will be submitted.
4. Gravity sewer length from MH #15 to lift station should be described on
plan/profile sheets.
OK. Will show.
5. City may desire to have lift station provided emergency power via a building
generator.
Addressed in Planning Department comments.
Vehicle /pedestrian circulation
1. Sidewalks are required for the public roads per Section 21- 52.04.
Addressed in PUD Agreement.
2. A copy of the FDOT connection permit and any RAI information should be
provided to the City.
OK
Stormwater Management Requirements
1. A copy of the SJRWMD permit and any RAI information should be provided to
the City per Section 21- 53.04.
Will provide.
2. A copy of the FDEP/NPDES notice of intent should be provided to the City per
Section 21 -53.04
Will provide.
SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
Parking/loading
1. Additional information is needed to confirm conformance of parking (number,
size, etc.)
Addressed in Planning Department comments.
Legal Department
1. Based on the review of the plan submitted, the applicant should comply with all
City, County, State and Federal requirements for this project.
OK
Department of Environmental Services
Water
1. Locating wire on the water mains will be required.
Shown on note C21 — Note 6.
2. For the master plan, a double tap on the twelve inch (12 ") water main will provide
looping of the water line within the complex and allow a back up source of water
in the event of a problem with one of the feeds.
OK as is per Terry.
Sewer
1. Page C -11 does not show a sewer stub for the commercial area. This will be
necessary.
Will show on revised site plan.
2. The laterals to the buildings are very long runs. As an alternative, two laterals to
each building with the connections to separate manholes would be a more prudent
system. This would also encounter less piping under paved areas and eliminate
one manhole.
OK as is per Terry.
3. If two connections are required for each building, two stub outs should be
provided for the future buildings.
OK as is per Terry.
4. Gate on fencing for the lift station should be a roll gate rather than a swing gate.
Will show.
5. Wet well diameter shall be eight -foot (8') minimum.
OK.
6. Top elevation of wet well shall be a minimum of twelve inches (12 ") above the
crown of the road.
Agreed to six inches (6') above crown.
7. Locate wire on force main will be required.
OK.
8. All sewer stub outs are not specified as to size.
Will show 8' on revised site plan.
9. Add note stating that air release valves are required on high points of the force
main.
Will show.
Stormwater
1. Placement of silt fencing around the property during construction is required and
should be shown on the plans.
OK.
SP 0413 — Edgewater Harbor (Phase I)
Technical Review Committee Minutes
January 6, 2005
Streets
1. Temporary barricade should be placed at end of street until the next phase is
completed.
OK.
Other
1. Page C -IA —both buildings are numbered one.
OK.
2. Page C -21 — Note #1 should have the phone number 424 -2460.
OK.
There were questions raised regarding impact fees. Determination will be made by City
Manager regarding this issue.