Loading...
11-08-2005 - Dr. MartinSP 0518— Dr. Martin Technical Review Committee Minutes November 8, 2005 In Attendance: Bonnie Wenzel Jill Danigel Terry Wadsworth Brenda Johnson Luis Geil Planning Department All sections referenced are from the City of Edgewater Land Development Code. General 1. Reduce the number of driveways in accordance with Section 21 -52.02 (g). Applicant will try to comply. 2. Stormwater outfall must be directed to US 1 and a copy of the FDOT drainage access permit must be provided prior to development approval. Height difference of five feet - will have to go up 5 feet, cannot pump up to U.S> 1. Desigend for 100 yr flood — pop off not required per code (Brenda Johnson) 3. Palm Breeze Drive must be widened to 24 feet from US 1 to the east property line of this site. Road construction must be in accordance with the City of Edgewater Standard Construction Details. Need text amendment — may no be required to widen road 4. The setback to the south shall be 25 feet in accordance with Section 21- 50.02, Table V -1. Revise plan to indicate this requirement. Will comply 5. Section 21 -52.02 (g) requires driveways "line up with driveways across the street ". Indicate location of driveway to Cox project on the north side of Palm Breeze Drive. Applicant will try to comply. 6. Provide a sign detail. Revise the location of the sign to remove it from the sight triangle in accordance with Section 21 -38.03 (a). Will comply 7. A detail is provided on the plan indicating the manner of construction of the six - foot high masonry wall. Revise to indicate the height of the wall of west side. Will comply Parking 1. Section 21- 57.02, Table V -7 requires a width of 12 feet and depth of 18 feet for 45- degree parking spaces. Revise plans to reflect this requirement. Actually 60° parking — this is OK 2. Section 21- 57.01, Table V -7 requires a back up maneuver depth of 15 feet. Revise parking space #1 to reflect this requirement. This space will be eliminated SP 0518— Dr. Martin Technical Review Committee Minutes November 8, 2005 3. Wheelstops are not permitted. The perimeter of the parking lot must be curbed in accordance with Section 21 -54.03 (b). Remove wheelstop detail from the revised plan. ASK DARREN Landscaping 1. Revise to reflect shrub /tree sizes 55.03 (b). Will comply in accordance with Sections 21 -54.02 (e) 21- 2. Section 21 -54.03 (a) requires a ten foot landscaped area between vehicular use areas and adiacent public roadways. Indicate as such in the southeast maneuver area. OK — not adjacent to roadway 3. A total of 256 shrubs are required. Indicate on revised plans. Will comply Building Department 1. Construction drawings accepted after October 1, 2005 shall comply with the 2004 Florida Building Codes for 120 MPH wind speed within the impact debris region. Will comply 2. Provide all supporting documents required from the submittal list on the building permit application form. Plans cannot be reviewed without all documents provided and fee paid. Will comply Fire - Rescue Department 1. The required fire flow for this project is 750 gallons per minute. OK City engineer (David King — Quentin L. Hampton, Associates, Inc.) Resource protection standards 1. A listed species survey must be submitted for review. Will comply Site design 1. Additional information is required on the off site sewer. N/A 2. Easements will be required for all facilities to be maintained by the City. Will comply 3. Sidewalks are required per Section 21- 52.04. N/A Stormwater management 1. A copy of the required SJRWMD permit shall be provided to the City. Will comply 2. Calculations show pre and post peak discharges for a 25 -year event. Will comply SP 0518— Dr. Martin Technical Review Committee Minutes November 8, 2005 3. Plan should include overflow discharge to public drainage facility. N/A Parkin /lg_oadiniz 1. The 90- degree handicap space does not have the required 24 -foot aisle. This is OK 2. Aisle width for angled parking is too narrow per Section 21- 57.02. This is OK 3. "Exit only — do not enter" signage should be provided between angled and 90 degree portions of parking. N/A Other 1. Tie in slopes at south side of parking and refuse enclosure appear to be excessive. Will comply Department of Environmental Services Water 1. The water connection should be made on Palm Breeze Drive as opposed to the US One right of way. Will comply Wastewater 1. See attached hand drawn modification for the design of the sewer line from this project site to the lift station site on the Cox property which City staff prefers to see installed. OK 2. There is concern centering around the ownership and operation/maintenance of the lift station proposed to be constructed on the Cox property on the north side of Palm Breeze Drive. The issues are as follows: a. The construction schedule of the Cox Building and on -site life station will directly impact the ability of this project to obtain a Certificate of Occupancy. Will comply — will look into putting lift station in prior to construction of Cox building. b. I would recommend ownership of the lift station be transferred to the City. It has been mentioned that the resubmittal of the Cox project will contain a new lift station detail and site location. This plan will be impacted by those changes. Will comply General /Stormwater 1. The installation of the sewer line will require a road repair. Please add detail showing the road repair requirements. Will comply 2. The water line should be tapped from the eight -inch (8 ") water line of the north side of Palm Breeze Drive. Will comply 3. An easement was requested from the Cox Building to cover the sewer line for this project. Provide verification of the granting of this easement. SP 0518— Dr. Martin Technical Review Committee Minutes November 8, 2005 Will comply 4. The stormwater calculations stated "the proposed drainage system will store and treat the runoff in the exfiltration trench prior to discharge off site ". a. Section 21 -53.04 (h) discourages the use of filtration systems. Will complyNo offsite discharge is shown. The only dedicated drainage is that of the FDOT drainage swale along US 1. Therefore, design needs to be such as to provide for a 100 year /3 day storm event or discharge to the US 1 Right Of Way. N/A b. Page 3 of the stormwater calculations state that discharge will be to Class III waters. The Indian River Lagoon is a Class II water body. This should be clarified for the SJRWMD permitting process. Will comply 5. A silt screen will be required at a minimum on the easterly and southerly sides of the site as a minimum best management control for erosion control. Will comply