02-13-2012 - Workshop - U S Highway 1 Sidewalk Project Update CITY COUNCIL OF EDGEWATER US HIGHWAY 1 SIDEWALK PROJECT UPDATE WORKSHOP FEBRUARY 13, 2012 5:30 P.M. COUNCIL CHAMBERS MINUTES CALL TO ORDER Mayor Thomas called the US Highway 1 Sidewalk Project Update to order at 5:30 p.m. in the Council Chambers. ROLL CALL Mayor Michael Thomas Present Councilman Justin Kennedy Present Councilwoman Gigi Bennington Present Councilman Michael Ignasiak Present Council Seat District 4 Vacant City Manager Tracey Barlow Present City Clerk Bonnie Wenzel Present City Attorney Aaron Wolfe Present City Clerk Wenzel recognized Council Seat District 4 was vacant due to the passing of Councilman Ted Cooper. City Manager Barlow turned the meeting over to Ken Hooper, an associate with B & H Consulting who presented a status update with regard to the US Highway 1 Sidewalk Project. Fred Burkett, Kimley Horn & Associates, went through the attached Powerpoint Presentation by describing the project, which would provide a definitive right -of -way along the entire 4.7 mile corridor. Councilman Ignasiak asked if they anticipated any legal challenges to this from current property owners. Mr. Burkett stated they weren't addressing access management so it isn't an access issue. It was a sidewalk and an ADA compliant issue. They did not anticipate any legal issues. Councilwoman Bennington asked why they were spending all this money for a survey when there was no funds to do anything afterwards. Mr. Burkett informed her this was the first step. Money tends to find its way to where there is a project available. There are other types of federal programs out there. He then commented on getting this far and knowing where the right of way is at, having the plans on the shelf and being ready to go to construction. 1 Council Workshop February 13, 2012 Councilwoman Bennington felt it looked great from what they have seen but felt $600,000 was low for what they are planning on doing when it comes to the cost of the design. City Manager Barlow commented on the late Councilman Cooper being extremely beneficial with his influence on the TPO. They had been talking about sidewalks on U.S. #1 for many years. With the hard work of Councilman Cooper and Darren Lear they were able to put this together. This is just the next step that would get this project shovel ready for future grant dollars. He made mention of President Obama on the State of the Union where he wants to do more federal construction projects. He felt very confident getting the project this far puts them close to the top of being an eligible candidate if that money does become available. This is a big step forward for Edgewater to bring it this far and a $1.5 million grant at no matching cost for Edgewater was pretty good. Councilman Ignasiak stated if the federal government is already giving them this money to complete these processes, he didn't think they would be averse to funding the second part. City Manager Barlow identified this was a DOT project as well. He further identified new development coming in and the requirement for a sidewalk. City Manager Barlow recognized Malecia Harris who is helping manage grant compliance as well as searching for grants. Mayor Thomas asked what the timeline was on the survey. Mr. Burkett informed him the right -of -way survey would take another year to complete but the design survey would be done in April. Mayor Thomas felt there would be a possibility of problems with the No Name as well as a lot of utility problems too. City Manager Barlow identified he and Development Services Director Darren Lear were meeting with the new owners of the No Name tomorrow and would share some of this with him as he plans on some redevelopment. They suspect a portion of the building is within the DOT right -of -way and has been for years. City Manager Barlow then identified there would be a lot of positives to having the opportunity to finally do this certification. He further spoke of redevelopment opportunities in the future on the north side of U.S. #1. This is additional work that is already done for those plans as well. ADJOURNMENT There being no further business to discuss, Council moved to adjourn. The meeting adjourned at 5:43 p.m. 2 Council Workshop February 13, 2012 Minutes submitted by: Lisa Bloomer, CMC Attest: APPROVED: City of Edgewater, Florida Bonnie Wenzel, City Clerk Michael L. Thomas, Mayor 3 Council Workshop February 13, 2012 rrurpose • Right of Way Mapping of US 1 • Design of Sidewalk Improvements Funded by FDOT Local Agency Program ■ $1,500,000 ■ No Current Funding for Construction • Project Construction Cost - $ 400,000 • Construction Time — G Months ■ Project Team ■ Challenges and Opportunities ■ Project Schedule •lur6090> >91 Lis 9L %14 r• (LAP) Bill Byrd, PSM (30) Bill Hinkle, PSM (3o) Sheila Ware, PSM (26) Jeff Barnes, PSM (26) Rob Nance (28) Robin Cummings (21) Rae LeMoine (21) A.J. Harris (21) Jason Donley (14) Jason Leslie (14) Luke Fulford (13) Jamie Munroe (1z) Rick Collin (12) Gerry Davis (11) Mike Jacobs (11) Ebenezer Laing, PSM (11) Lee Thibodeau (10) Jorge Rios (8) Mark Lafaber (6) Jacob Juffman (6) Al Martinez (4) Tracy Birch, PSM (27) Dennis Bryan (33) Gary Bryan (27) Luis Calderon (38) Eli Donaldson (14) Jeff Schwartz, PSM (1o) Randy Holland (3o) EDG E WATEI y,mrurmp, Data Solutions. Inc. David A. White, PSM Geodata Consultants, Inc. (MBE) Project Mana Bowyer - Singleton, Inc. 7reBur Ardaman and Associates, Inc. Archaeological Consultants, Inc. (MBE) Aerial Cartographics of America. Inc. Chris Hansen. P.E. Task Leaders I Jon Martin, P.E. David White, PSM Chris Hansen, P.E. Paul deVivero, PSM Dennis McQuillan, E.I. Mrke (laL Bill Donley, PSM Jay Jackson, P.E. Ron Hildebrand, P.E. Earl Wills, P.E. ,. 5 1" 1 11 t Chuck Cunningham, P.E. Vikram Dogra, D.E. (TX) Toni Farnan, P.E. Chris Hansen, P.E. Fred Burkett, P.E. Marty Black, AICP, ICMA -CM Jay Jackson, D.E. Chris Nino. P( A. ASI A. 1 FFD`,. ' P R O F E S S I O N A L E N G I NE E P I N G AND SURVEYING SERVICES Final Design Services for SP 5 (US Hwy 1) FIGHT OF WAY MAPPING AND SIDEWALKS from Volco Road to North City Limits of Edgewater _ 144 A — .,...ice -_ ,..... �___' —__. - -: "q � � ♦ i a -41 �. z ' # • �',� t ',� t � ; r � 0.i .�„ .a'�+ �_ ,,� � .�;,..,. � .� ", . r " �'�3 ► �' �- t�'•w�5 M Y'.s � � /1 a.. � � Ise ;{ a � * t.. • �.' T 2:2� r._� T` • a. r* `F'i• 7iti i}< r .:t �J,r�f¢ " , i "} . t * * "w^ 4, R dr ' 4 � sue" 1 ,- ..J .� P r _ � .., r s- /dllu.r,:(ii4h � s ;'�►' ,,,}}, *^ � • _1__ _ r fir, r ` qty, Sk r ' i All f Prepared by NORTH SEGMENT a =� and Associates, Inc. North Segment 126 total driveways 104 non - compliant South Segment - 102 total driveways - 43 non - compliant Driveway Slope Criteria y Curb Ramp Criteria qua 1:12 (8.33 %) max. grade North Segment - 79 total curb ramps - 9 non - compliant PROFESSIONAL ENGINEERING AND SURVEYING SERVICES Final Design Services for SR 5 (US Hwy 1) RIGHT OF WAY MAPPING AND SIDEWALKS- from Volco Road to North City Limits of Edgewater Prepared by EDGEWATER / NEW SMYRNA CEMETERY -AFTER CC/1 a dlAssociates, Inc. P P O F E S S I O N A L E N G I N EEPING AND SURVEYING SERVICE Final Design Services for SP 5 (US Hwy 1) PIGHTOF WAY MAPPING AND SIDEWALKS from Volco Road to North City Limits of Edgewater V Ito 6w Lft 'ARM I CRITICAL SWALE SECTION -AFTER qM Prepared by PPI Z" Kimley-Horn ki and Associates, Inc. P R O F E S S I O N A L E N G I N E E P I N G AND SURVEYING SERVICES Final Design Services for SP 5 (US Hwy 1) FIGHT OF WAY MAPPING AND SIDEWALKS from Volco Road to North City Limits of Edgewater s_ 4 3 r F« 'l &V. STANDARD SWALE SECTION -BEFORE 1 by PF� Z"Kimley -Horn and Associates, Inc. it P R O F E S S I O N A L E N G I N E E P I N G A N D S U P V E Y I N G Final Design Services for SP 5 (US Hwy t) RIGHT OF WAY MAPPING AND SIDEWALKS S E R V I C E S from Volco Road to North City Limits of Edgewater Prepared by STANDARD SWALE SECTION - AFTER c:n ndlAsocates,Inc. P R O F E S S I O N A L E N G I N E E P I N G A N D S U P V E Y I N G Final Design Services for SR 5 (US Hwy 1) PIGHT OF WAY MAPPING AND SIDEWALKS IJ 11� 1A r� S E R V I C E S from Volco Road to North City Limits of Edgewater EXCESS PAVEMENT Prepared by Kimley -Horn and Associates, Inc. P R O F E S S I O N A L E N G I N E E P I N G AND SURVEYING SERVICES Final Design Services for SR 5 (US Hwy 1) PIGNT OF WAY MAPPING AND SIDEWALKS from Volco Road to North City Limits of Edgewater a� .r� lei'►' , �11 Prepared by EXCESS PAVEMENT c =� arid Associates, ociates, Inc. FDOT Property Owners Utility Owners ■ VoTran ■ Public Information Meetings ■ On -site Meetings with Property Owners Right of Way Survey Design Survey Preliminary Engineering June 6. 2013 , r Final Design July 18, 2013 ONIZOM114 :1a9