Loading...
99-R-145/25/20239:10:44 AM I nstru ment #2023107864 #1 Book:8411 Page:4850 V,d RESOLUTION NO. 99-R-14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA, GRANTING A VARIANCE FROM THE SHORELINE BUFFER AND IMPERVIOUS SURFACE REQUIREMENTSOFTHESTORMWATERMANAGEMENT ORDINANCE FOR THE LOCATION AT 8 HARRIS CIRCLE; REPEALING ALL RESOLUTIONS IN CONFLICT HEREWITH AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Edgewater, Florida has made the following determinations: Pursuant to Section 9.5-64 of the Code of Ordinances, Joyce K. Searl applied for a variance from the shoreline buffer and impervious surface requirements of the Storm Water Management Ordinance to allow construction of a swimming pool (15 x 30 fool) including a concrete deck (30 x 48 foot) at 8 Hams Circle which is located on the Intracoastal Waterway. 2. The recommendations of the City Engineerhave been considered as well as the effect on the water resources of Edgewater. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Edgewater, Florida: Section 1. The request of Joyce IC Searl for a variance to construct a swimming pool behind their home at 8 Harris Circle is hereby granted subject to the following conditions: 99-R-14 Instrument #2023107864 #2 Book:8411 Page:4851 a) the concrete deck must be constructed a minimum of I I feet from the north properly line as per Section 7-324 of the Code of Ordinances. Construction must be 5 feet fiom any easement line. Of record, it is noted that them is a 6 foot utility easement at this property line. b) The concrete deck must be constructed a minimum of 10 feet from the south properly line as per Section 7-324 of the Code of Ordinances. c) The concrete deck must be constructed 20 feet from the nearest coquina rip -rap stones. This will allow for a standard exfiltmtion trench to be constructed along the east and of the swimming pool to accommodate the trapping of any stormwater runoff from entering the Intracoastal Waterway. The stormwater runoff is no allowed to dils6tly enter the Intracoastal Waterway. The exfiltradon system must be designed by a d) A proposed construction plan for the swimming pool must be submitted for review to the City indicating construction details, elevation and required information. e) No construction may be initiated until final approval and permitting is completed by the City. Section 2. All resolutions or parts of resolution in conflict herewith be and the same are hereby repealed. Section 3. This resolution shall take effect upon adoption. 99-R-14 2 Instmment N2023107854 #3 Book:8411 Page:4852 Laura E. Rath, Volusla County Clerk of Court y/ V.✓ After Motion by Councilman Hammond and Second by Councilman Gornto, the vote on this resolution is as follows: Mayor Randy G. Allman NAY Councilman Jim Gornto AYE Councilman Myron F. Hammond AYE Councilman Gary W. Roberts AYE Councilwoman Judy Lichter AYE PASSED AND DULY ADOPTED this 2nd day of August, 1999. CITY COUNCIL OF THE CITY /OOFFF E/EDDGGE�/W��A/T�ER, FLORIDA Bv�//ieil// Y17- RaVy 0: Lillm6a Mayor APPROVED FOR FORM AND CORRECTNESS: Rim Clayton City Attorney 99-R-14 After Motion by Councilman Hammond and Second by Councilman Gornto, the vote on this resolution is as follows: Mayor Randy G. Allman NAY Councilman Jim Gornto AYE Councilman Myron F. Hammond AYE Councilman Gary W. Roberts AYE Councilwoman Judy Lichter AYE PASSED AND DULY ADOPTED this 2nd day of August, 1999. CITY COUNCIL OF THE CITY OF EDGGEWATER, FLORIDA By ( f Ra y . Ilman Mayor APPROVED FOR FORM AND CORRECTNESS: Nikki Clayton City Attorney 99-R-14