99-R-145/25/20239:10:44 AM I nstru ment #2023107864 #1 Book:8411 Page:4850
V,d
RESOLUTION NO. 99-R-14
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDGEWATER, FLORIDA, GRANTING A VARIANCE FROM
THE SHORELINE BUFFER AND IMPERVIOUS SURFACE
REQUIREMENTSOFTHESTORMWATERMANAGEMENT
ORDINANCE FOR THE LOCATION AT 8 HARRIS CIRCLE;
REPEALING ALL RESOLUTIONS IN CONFLICT
HEREWITH AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Edgewater, Florida has made the following
determinations:
Pursuant to Section 9.5-64 of the Code of Ordinances, Joyce K. Searl applied for a
variance from the shoreline buffer and impervious surface requirements of the Storm Water
Management Ordinance to allow construction of a swimming pool (15 x 30 fool) including a
concrete deck (30 x 48 foot) at 8 Hams Circle which is located on the Intracoastal Waterway.
2. The recommendations of the City Engineerhave been considered as well as the effect
on the water resources of Edgewater.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Edgewater,
Florida:
Section 1. The request of Joyce IC Searl for a variance to construct a swimming pool behind
their home at 8 Harris Circle is hereby granted subject to the following conditions:
99-R-14
Instrument #2023107864 #2 Book:8411 Page:4851
a) the concrete deck must be constructed a minimum of I I feet from the north properly
line as per Section 7-324 of the Code of Ordinances. Construction must be 5 feet
fiom any easement line. Of record, it is noted that them is a 6 foot utility easement
at this property line.
b) The concrete deck must be constructed a minimum of 10 feet from the south properly
line as per Section 7-324 of the Code of Ordinances.
c) The concrete deck must be constructed 20 feet from the nearest coquina rip -rap
stones. This will allow for a standard exfiltmtion trench to be constructed along the
east and of the swimming pool to accommodate the trapping of any stormwater
runoff from entering the Intracoastal Waterway. The stormwater runoff is no
allowed to dils6tly enter the Intracoastal Waterway. The exfiltradon system must be
designed by a
d) A proposed construction plan for the swimming pool must be submitted for review
to the City indicating construction details, elevation and required information.
e) No construction may be initiated until final approval and permitting is completed by
the City.
Section 2. All resolutions or parts of resolution in conflict herewith be and the same are
hereby repealed.
Section 3. This resolution shall take effect upon adoption.
99-R-14 2
Instmment N2023107854 #3 Book:8411 Page:4852 Laura E. Rath, Volusla County Clerk of Court
y/ V.✓
After Motion by Councilman Hammond and Second by Councilman Gornto, the vote on this
resolution is as follows:
Mayor Randy G. Allman
NAY
Councilman Jim Gornto
AYE
Councilman Myron F. Hammond
AYE
Councilman Gary W. Roberts
AYE
Councilwoman Judy Lichter
AYE
PASSED AND DULY ADOPTED this 2nd day of August, 1999.
CITY COUNCIL OF THE
CITY
/OOFFF E/EDDGGE�/W��A/T�ER, FLORIDA
Bv�//ieil// Y17-
RaVy 0: Lillm6a
Mayor
APPROVED FOR FORM
AND CORRECTNESS:
Rim Clayton
City Attorney
99-R-14
After Motion by Councilman Hammond and Second by Councilman Gornto, the vote on this
resolution is as follows:
Mayor Randy G. Allman
NAY
Councilman Jim Gornto
AYE
Councilman Myron F. Hammond
AYE
Councilman Gary W. Roberts
AYE
Councilwoman Judy Lichter
AYE
PASSED AND DULY ADOPTED this 2nd day of August, 1999.
CITY COUNCIL OF THE
CITY OF EDGGEWATER, FLORIDA
By ( f
Ra y . Ilman
Mayor
APPROVED FOR FORM
AND CORRECTNESS:
Nikki Clayton
City Attorney
99-R-14