Loading...
2015-R-04 RESOLUTION NO. 2015-R-04 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA; RESOLUTION FOR APPROVAL AND EXECUTION OF THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) LOCAL AGENCY PROGRAM (LAP) SUPPLEMENTAL AMENDMENT #1 FOR FPN #435487-1-38-01 RELATING TO DESIGN SERVICES FOR THE SIDEWALK NEAR EDGEWATER PUBLIC ELEMENTARY (FLAGLER FROM 12TH STREET TO PARK AVENUE); REPEALING RESOLUTIONS IN CONFLICT HEREWITH AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City of Edgewater and the Florida Department of Transportation (FDOT) desire to facilitate the Local Agency Program (LAP) Project (FPN #435487-1-38-01) known as "Design services for a pedestrian sidewalk near Edgewater Public Elementary" (Flagler Avenue from 12th Street to Park Avenue). WHEREAS, the FDOT has requested the City of Edgewater to execute and deliver the Supplemental Amendment #1 for the Local Agency Program Agreement for the aforementioned project, FPN #435487-1-38-01. NOW,THEREFORE,be it resolved by the City Council of Edgewater, Florida: Section 1. The City Council of the City of Edgewater hereby approves Supplemental No. 1 to the Local Agency Program (LAP) Project (FPN #435487-1-38-01) known as "Design services for a pedestrian sidewalk near Edgewater Public Elementary" (Flagler Avenue from 12th Street to Park Avenue). Section 2. The City Council hereby authorizes the Mayor to execute Supplemental No. 1 to the Local Agency Program (LAP) Project(FPN #435487-1-38-01) known as "Design services for a pedestrian sidewalk near Edgewater Public Elementary"(Flagler Avenue from 12th Street to Park Avenue),which is attached hereto an incorporated herein as Exhibit"A". 2015-R-04 1 After a motion to approve by LUfV1,r*1Y)i21) '3!azi with Second by ((.,(i ll(?r;l JQmaxi 'Powelr the vote on this resolution held on January 5, 2015 was as follows: AYE NAY Mayor Mike Ignasiak X Councilwoman Christine Power Councilwoman Gigi Bennington C1( SE0 Councilman Dan Blazi Councilman Gary T. Conroy _ PASSED AND DULY ADOPTED this 5th day of January,o Ja uary, 2015. ATTEST: CITY COUNCIL OF THE CITY OF EDGEW TER,FLORIDA u, By: , ilonnie Wenzel Mike I__ asiak City Clerk Mayor Al( 'Vracey T. Barlow //City Manager For the use and reliance only by the City of Edgewater, Approved by the City Council of the City of Edgewater Florida. Approved as to form and legality by: at a meeting held on this 5th day of January,2015 under Aaron R. Wolfe,Esquire Agenda Item No 8 h • City Attorney Doran, Sims,Wolfe,Kundid, Ciocchetti&Wagner 2015-R-04 2 k � � i ry Td m City of tWG15ATERI January 8, 2015 Ms. Dianne Peek, Program Coordinator District 5 Local Government Agreements Florida Department of Transportation 719 South Woodland Boulevard, MS 4-520 DeLand, Florida 32720 RE: LAP Supplemental Agreement: FPN 435487-1-38-01 Dear Ms. Peek; At their regular meeting of January 8, 2015 City Council approved the above- referenced agreement and the associated Resolution No. 2015-R-04. A certified copy of the Resolution is being provided along with one agreement execute by the city; please email a color copy of the agreement once executed by FDOT to bwenzel a,cityofedgewater.org. Should you have any questions regarding this matter please contact me. Sincerely, Bonnie Wenzel, CMC City Clerk cc: Malecia Harris, City of Edgewater (w/out attachments) John McKinney, City of Edgewater (w/out attachments) Office of the City Clerk P.O.Box 100•Edgewater,FL 32132-0100 f3R61 424-2400 Ext. 1 101 •Fax f3861 424-2410 Centennial FDOT 1915*2015 Florida Department of Transportation RICK SCOTT 719 South Woodland Boulevard, MS 4-520 JIM BOXOLD GOVERNOR DeLand,FL 32720 SECRETARY January 12, 2015 City of Edgewater Attention: Malecia Harris Grants/Projects Coordinator Post Office Box 100 Edgewater, Florida 32132-0100 SUBJECT: LOCAL AGENCY PROGRAM(LAP) SUPPLEMENTAL AGREEMENT #1 FPN: 435487-1-38-01 Contract No: AR118 Project: Design services for the Pedestrian sidewalk near Edgewater Public Elementary Dear Ms. Harris: One fully executed Supplemental LAP Agreement is enclosed for your records and$.00 has been encumbered for this project. A scanned copy of the executed Supplemental LAP Agreement has been emailed to the City Clerk, Bonnie Wenzel. If you have any questions, lease call Dianne Peek at 386.943.5400. Sincerely, ario Bizzio, for Lisa Bu ch District Program Managem t Manager Enclosures cc: Denise Lipscomb Vince Vacchiano John McKinney Bonnie Wenzel www.dot.state.fl.us 525-010-32 PRODUCTION SUPPORT 09/11 Page 1 of 4 SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM 435487-1-38-01 DUNS NO. SUPPLEMENTAL CONTRACT NO. 80-939-7102 AGREEMENT ARI18 The Florida Department of Transportation and the City of Edgewater desires to supplement the original Agreement entered into and executed on June 20, 2014 as identified above. All provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this supplement. The changes to the Agreement and supplements,if any,are described as follows: PROJECT DESCRIPTION Name Design services for a pedestrian sidewalk near Edgewater Public Elementary Length 0.91 miles Termini Sidewalk to run adjacent to the east side of Flagler Avenue from 12th Street to Park Avenue Description of Work: The project includes the design of pedestrian sidewalk in the vicinity of Ed�ewater Public Elementary School. The sidewalk is to run adjacent to the east side of Flagler Avenue from Park Avenue to 12 Street. The total length of sidewalk is approximately 0.91 miles. Improvements include the construction of 4" thick concrete sidewalk (varying between 5-ft and 6-ft), removal and replacement of concrete driveways, and mailbox relocation and replacement. All crosswalks, sidewalks, and pedestrian crossings will adhere to ADA Standards. Additional improvements include detectable warning surfaces, signing, and pavement markings. Drainage improvements include the removal of existing side drains, construction of ditches, updating existing water conveyance, back of sidewalk drainage systems, and the extension of an existing headwall. Coordination with utility companies is required. Power poles will require relocation. Based on the apparent R/W, property acquisitions (RNA will be required on the east side of Flagler Avenue, Wetlands assessment and permit coordination is required. Survey of the east side of Flagler Avenue will be required. Reason for Supplement and supporting engineering and/or cost analysis: -To clarify which tasks within the awarded contract are not eligible for federal funds on this project- In the awarded contract,the design work is broken into nine tasks. All of the tasks are federal aid reimbursement eligible with the exception of Task 9, Post-Design Services,which is in the amount of$1,440.00. Invoices will be reimbursed at 91.63%, reflecting the Federal funding passed through the Department,which includes reimbursement for the design services. The total reimbursement will not exceed$80,302.00. The Agency's contribution(Local Funds)to the project is $8,920.00 or approximately 10%of the total project costs. 525-010-32 PRODUCTION SUPPORT 09/11 ADJUSTED EXHIBIT B SCHEDULE OF FUNDING Page 2 of 4 SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM 435487-1-38-01 SUPPLEMENTAL DUNS NO. AGREEMENT CONTRACT NO. 80-939-7102 ARI18 FUNDING TYPE OF WORK By Fiscal Year PREVIOUS TOTAL ADDITIONAL CURREN ( TTOTAL TOTALAGENCY TOTALSTATE& PROJECT FUNDS PROJECT FUNDS PROJECT FUNDS FUNDS FEDERALFUNDS Planning FY: FY: FY: FY: FY: FY: Total Planning Cost 0.00 $0.00 $0.00 $0.00 $0.00 Project Development& Environment(PD&E) FY: FY: FY: FY: FY: FY: Total PD&E Cost $0.00 $0.00 $0.00 $0.00 $0.00 Design FY: 2013-2014 $89,222.00 $89,222.00 $8,920.00 $80,302.00 FY: 2014-2015 FY: FY: FY: FY: Total Design Cost $89,222.00 $0.00 $89,222.00 $8,920.00 $80.302.00 Right-of-Way FY: FY: FY: FY: FY: FY: Total Right-of-Way Cost $0.00 $0.00 $0.00 $0.00 Construction FY: FY: FY: FY: FY: FY: Total Construction Cost $0.00 $0.00 $0.00 $0.00 $0.00 Construction Engineering and Inspection(CEI) FY: _ FY: FY: FY: FY: FY: Total CEI Cost $0.00 $0.00 $0.00 $0.00 $0.00 Total Construction&CEI Costs $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL COST OF THE $89,222.00 $0.00 $89,222.00 $8,920.00 $80,302.00 PROJECT 525-010-32 PRODUCTION SUPPORT 09/11 Page 3 of 4 SUPPLEMENTAL NO, STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM 435487-1-38-01 SUPPLEMENTAL DUNS NO. AGREEMENT CONTRACT NO. 80-939-7102 AR118 IN WITNESS WHEREOF,the parties have caused these presents to be executed the day and year first above written. AGENCY CITY OF EDGEW ER STATE O ORIDA DEPARTMENT OF TRANSPORTATION I '� Y B Y B Name: rn i C:a\C�L �(�Y�0.S�of Name: FrIgnk J.O'Dea, P. . Title: (Nc,�OLL-`pr Title: Director of Transportati tvelo ent / T _ Attest: A Name: j,r,,�� LJc,-�Z- Q_i U N"am Title: CL4X-j CQ..*, Title: Administrative Assist nt Date: 5 Date: b Legal Review: — : - C&- See attached Encumbrance Form of funding approval by Comptrol r. S1 ATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 LOCAL AGENCY PROGRAM AGREEMENT PRODUCTION SUPPORT 08/06 Page 4 of 4 EXHIBIT "1" SINGLE AUDIT ACT Federal Resources Awarded to the Recipient Pursuant to This Agreement Consist of the Following: Federal Agency: Federal Highway Administration CFDA#: 20.205 Highway Planning and Construction Amount: $ 80,302.00 Compliance Requirement: Allowable Activities: To be eligible, most projects must be located on public roads that are not functionally classified as local. The major exceptions are the Highway Bridge Replacement and Rehabilitation Program, which provides assistance for bridges on and off the federal-aid highways, highway safety activities, bicycle and pedestrian projects, transportation enhancement activities, the recreational trails program, and planning, research, development, and technology transfer. Proposed projects meeting these and other planning, design, environmental, safety, etc., requirements can be approved on the basis of state and local priorities within the limit of the funds apportioned or allocated to each state. Allowable Costs: Eligible activities and allowable costs will be determined in accordance with Title 23 and Title 49 C.F.R. and the OMB cost principles applicable to the recipient/sub-recipient. Eligibility: By law, the federal-aid highway program is a federally assisted state program that requires each state to have a suitably equipped and organized transportation department. Therefore, most projects are administered by or through State Departments of Transportation (State DOTS). Projects to be funded under the federal-aid highway program are generally selected by state DOTS or Metropolitan Planning Organizations (MPOs), in cooperation with appropriate local officials, as specified in 23 U.S.C. and implementing regulations. Territorial highway projects are funded in the same manner as other federal-aid highway projects, with the territorial transportation agency functioning in a manner similar to a state DOT. Most Federal Land Highway Program (FLHP) projects are administered by the Federal Highway Administration (FHWA) Office of Federal Lands Highway and its Divisions or by the various Florida Land Management Agencies (FLMAs). Under the FLHP, projects in the Indian Reservation Road (IRR) Program are selected by Tribal Governments and are approved by the Bureau of Indian Affairs (BIA) and the FHWA. Due to recent legislation, Tribal Governments meeting certain requirements may now administer various IRR projects on behalf of the BIA and FHWA. The Fish and Wildlife Service (FWS) and the National Park Service (NPS) select projects in the Refuge Road and Park Roads and Parkways Programs, respectively. For the Forest Highway Program, the Forest Service, the States and the FHWA jointly select projects. Compliance Requirements Applicable to the Federal Resources Awarded Pursuant to This Agreement Are As Follows: The recipient of Local Agency Program (LAP) funding must comply with the statutory requirements in Sections 112.061, 215.422, 339.12, and 339.135, Florida Statutes, and Title 23 and Title 49, C.F.R.