Loading...
2004-R-03 It' RESOLUTION NO. 2004-R-03 A RESOLUTION OF INTENT OF THE CITY COUNCIL OF THE CITY OF EDGEW ATER, FLORIDA; AUTHORIZING SUBMISSION OF A PONCE DE LEON INLET AND PORT DISTRICT JOINT P ARTICIP ATION PROGRAM!DREDGING ASSISTANCE PROGRAM GRANT APPLICATION TO THE COUNTY OF VOLUSIA; ASSURING DEDICATION AND AVAILABILITY OF THE REQIDRED) MATCHING FUNDS; AUTHORIZING EXECUTION OF THE GRANT APPLICATION AND AWARD DOCUMENTS; PROVIDING FOR TRANSMITTAL OF THE GRANT APPLICATION AND CERTIFICATION TO THE PONCE DE LEON INLET AND PORT DISTRICT; PROVIDING FOR CONFLICTING PROVISIONS, SEVERABILITY AND APPLICABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Edgewater, Florida, has made the following determinations: 1. The George R. Kennedy Memorial Park is a 2.70 acre recreational facility and is located at 103 North Riverside Drive, Edgewater, Florida. 2. The City ofEdgewater wishes to continue development of Kennedy Park and initiate the Phase III improvements. 3. City Council and Staff have reviewed the Joint Participation Program (JJP) and Dredging Assistance Program (DAP) Grant Application and Staff recommends submission of the application. NOW, THEREFORE, be it resolved by the City Council ofthe City of Edge water, Florida: Section 1. Authorization. The City Council hereby authorizes submission of the Ponce de Leon Inlet and Port District Joint Participation Program and Dredging Assistance Program Grant Application to the V olusia County's Ponce de Leon Inlet and Port District Department, which 2004-R-03 1 is attached hereto and incorporated as Exhibit "A". Section 2. The Project for which the Grant is requested, will be known as Kennedy Park, Phase III. Section 3. The total cost ofthe Project is estimated to be two hundred twenty thousand three hundred thirty and no/lOO dollars ($220,330.00). Section 4. The City of Edge water is hereby requesting a grant of fifty percent (50%) for an amount of one hundred ten thousand one hundred sixty-five and no/lOO dollars ($110,165.00). Section 5. The City hereby assures dedication and availability of the matching funds in an amount of one hundred ten thousand one hundred sixty-five and no/lOO dollars ($110,165.00) within ninety (90) days of the Grant Award Funding Notification. Section 6. The City Council hereby authorizes the Mayor or City Manager to enter into and execute all documents relating to the grant application and award. Section 7. City Council hereby acknowledges that the City is fiscally and legally responsible to satisfactorily develop, operate and maintain the project. Section 8. Authorization for Transmittal. City Council hereby designates the City Clerk to transmit a Certified copy ofthis Resolution and the original Grant Application with ten (10) additional copies to the County of Vol usia's, Ponce de Leon Inlet and Port District Department. Section 9. Conflicting Provisions. All resolutions or parts of resolutions in conflict herewith be and same are hereby repealed. Section 10. Severability and Applicability. If any portion of this resolution is for any reason held or declared to be unconstitutional, inoperative, or void, such holding shall not affect the remaining portions of this resolution. If this resolution or any provisions thereof shall be held 2004-R-03 2 u to be inapplicable to any person, property, or circumstances, such holding shall not affect its applicability to any other person, property, or circumstance. Section 11. Adoption and Effective Date. This resolution shall take effect on January 26, 2004. After Motion byCouncilman Vincenzi the vote on this resolution was as follows: Mayor Donald A. Schmidt Councilman James P. Brown Councilman Dennis A. Vincenzi Secondby Councilwoman Lichter , AYE NAY x Councilwoman Harriet E. Rhodes _V Councilwoman Judy Lichter x PASSED AND DULY ADOPTED this 26th day of January, 2004. ATTEST: CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA Donald A. Schmidt Mayor For the use and reliance only by the City of Edgewater, Florida. Approved as to form and legality by: Scott A. Cookson, Esquire City Attorney Foley & Lardner �"9r�-Y� ate✓ Robin L. Matusick Legal Assistant/Paralegal Approved by the City Council of the City of Edgewater at a meeting held on this 2e day of January, 2004 under Agenda Item No. 6 F . 2004-R-03 3 . . P611cede Leonlnlet.tx.Port -District Joint Parti cipatioll Ptogral11/DredgingAssistancePro gram (Entire Form Must be typed) Applicant Information Name of Applicant: City of Edgewatar Project Title: Kennedy Park Phase III Contact Person/Project Manager: Jack Corder. Leisure Services Director Address: P.O. Box 100 Cky: Edgewater Fl ZIP Code: 32132 Telephone: 386.424.2485 FAX:386.424.2416 I hereby certify that the information provided in this application is true and accurate. Signature: qL ~r Date: /e? r;,J'l -c;I,J ~ (project-Manager) .. ... Proiect Information Project Type (Check All that Apply): _Property Acquisition ~redging _Passive Park Facility _Public Pier/Dock _Boat Ramp _Riverwalk ~ctive Recreational Facility .jLyacilities ConstructionfUpgrade _Environmental Enhancement _Other Brief Project Description: Dredge area adjacent to Park and boat ramps out .to the Channel and construct staging, dock and boat house. Project Location: 103 North Riverside Drive. (;ll"ro!':!': from c:it-y HR 11) Pr~ectPurpose~eed: To provide safe public access to the public boat ramps and , , Intra-Coastal Waterway and to provide construction to house the City's P\lblic Safety boat Project Site Control (Check Type): Applicant Owned: ~ Leased: Joint Ownership:_ Other: .~.-""""". ~ - ""'-~:."'"-~--'."-,, .....,,'.-.,..'''... '''''~~. .:.4~'_,",<.',_;",,-,., -....f.~.O;i). ,--=~..-, .>-- "'.-",-.;e-';..-. ,_ >""'~'._.,,,,...__ PoncedeLeon Inlet&Port District Applicant: City of Edgewater JoiIitPartidpation Program Grnnt Applica.tion (Municipality or Agency Name) (Eniire Application Must be Typed) .. General Criteria: 1. Is the project identified in the applicant's Capital Improvement Plan/Schedule or some other public planning document generated by the applicant or an agency thereof? Yes-L- No 2. Briefly describe how the project serves to improve or enhance<pub~ic recreational access to the navigable inland waterways within the Ponce de Leon Inlet &PoftDistrict. The City owns and maintains the existing boat docks and ramps. Dredging is necessary to provide public safety for boat maneuvering to and from the existing launcJ:lingfacUities and the ChanneL The City's Publ,:!,cSafety boat isp~rked inland as there arenodockage:: facilities to accommodate it. There havebe~n emergency, situatic;ms .where precious time has been <los~. The. public will be bettet-served by boat where it can be readily available for patrol, arid br rescue. J. Brieflycharacterize,describy or othenvise(luantify the need fottbepr()ject Aetailing anr . . user groups specifically served. . . ...... Tile City is experiencing an increase in public utilization of thelaunchirig facilities. The additional usage is causing recurrent washouts, creating sedimentation deposits and sandbanks. These areas become hazardous to crafts due to lower water depths. . I I The boating community includes local, county and some regional viSitors. They capitalize on the facility for recreation, pleasure, sports fishing and professional fishing guides. 1 4. List and quantify by number, length, etc., the facilities to be installed/constructed at the project site. (i.e. Docks, Piers, Boat Ramps, Restrooms, Parking Areas, Sidewalks etc.) 1. Dredge approximately 7,222 cubic yards of material 2. One 12'x 20' boat house 3. One boat lift 4. One 8'x 5~' temporary staging dock area 5. One 8'x 50' dock 6. Water and electricity 5. Briefly describe what agency will.be responsible for, and what funding SOUrce is available for long-term maintenance of the projectlfElc~lity. The City of Edgewater owns, operates and is responsible for the long-term maintenance of the facility through it's Leisure Services Department. The funding sources come from the Leisure Services budget as part of the City's General Fund. 6. Briefly describe any economic benefits related to the project and how this project compliments and/or duplicates other existing efforts/projects. The gredging will ensure safer publieaccess to and from the boat docks, ramps, and the Channel. Removal includes approximately 500 feet in length, 65 feet in wi~th and 6 feet in depth. An existing 90 acre spoil site, less than two miles from the Park, is where disposal will occur. The public purchases gas, bait, tackle, food and other supplies locally. There are no other boat dock or ramp facilities owned by the City. The Public Safety boat house and dock areas also serve the public by saving time and expense for boater and public emergency related needs. 2. 7. . List all other funding sources/agencies and amounts to be used to complete this project. 1. Ponce de Leon Inlet.&Port District Amount: $ 110,165.00 2. City of Edgewater (Applicant) . Amount: $ 110,165.00 3. Amount: $ 4. :Amount: $ 5. Amount: $ $ 6. Amount: Total Project Cost $220 . 330.00 8. Briefly describe how this project en.han.c~s (;q~stalwaierot ecological qUl:l.lity. The dreggigg activity will remove the silt sedimentation and.sandbanks which will help improve water quality adjacent to the Park and out to the Channel. ..... ~ 9. Is public access to the proposed project site/facilities guaranteed in perpetuity? (Check One) Yes.J- No~ Please ~xplain: i ' Kennedy Park is owned and operated by the City of Edgewater. 10. Will pu blic access to the site/facility be restricted in anyway? (Check One) Yes No ~ Please explain: . The Pa.rk is open to the public 24 hours per day, aeven days a week and is always free of ~harge. 3 11. Will aU site development/facilities COI1$trtiction Work be competitively bid? (Check One) Yes1L-No Ifnq.please briefly explairi: 12. List the permits and granting ~egulatory agencies that will be necessary for completion of the proposed project '. . . Permit Tvpe Grantine Aeencv l~nvironmental Resource Permit Department of Environmental Protecti? ~ '~. 2~aintenance Dredging Permit Arm~Corp. of 'Engineers 3,city. of EdgewaterBuilding Permit City of Edgewater .4. 13. Attachment I . (Please Submit all the Attachmen1$Listedwith the Application Form) An itemizedprojec~ budget listing major project components Le.,permitting. s~rveying. engineering .8? design. site work. facilities construction etc. Include an estimate of annual project/facility maintenance costs. 14. Attachment II A detailed timeline for the major project componentsas!isted in theitemizepproJect budget. , . 15. Attachment III . A Project Boundary Map/Sketch of the project location delineating the aereal extent/acreage of project site and identifying adjacent features. Le..streets. water bodies. existing facilities etc. 16. Attachment IV I ' A Conceptual Site Plan clearly labeling and displaying existing facilities on the si~ewellas the areas and facilities proposed for develop Il1ent on the project site. . 17. Attachment V A. reso.lu..ti.on f1.r.om. .the'a. p. p.l.i.c.a..n..t.s..' gove.ming. bo....a.. r.d. ~p.'.p... r.o....v.i. rig tho e lPP p.ro.~e. ct app...l.icat.ion,.statin. .g. '. the~bilityand.conul1itment to matchfurips fqrtqeprojectand verifying that theprojecth~sbeeh formally id. entified in the applicants'C.LP. orother lcing~range planriingdocument/schedule. . . .. -, . 4 Attachments Attachment I City of Edgewater . Kennedy Park Phase In Budget ITEM COST Design/Engineering- Dredging $ 3,200 Design/Engineering-Boathouse/Staging Dock $ 3,800 Surveying $ 3,000 Permitting-Dredging $ 1,500 Permitting-Boathouse/Staging Dock $ 1,500 Dredging $108,330 Site Work $ 15,000 Construction Boathouse/Staging Dock $ 84,000 Total Project Cost $220,330 Attachment II City of Edgewater Kennedy Park Phase III Time Line Component Completion Date Design/Engineering-Dredging August 2004 DesignlEngineering-Boathouse/Staging Dock August 2004 Surveying June 2004 Permitting- Dredging February 2005 Permitting-Boathouse/Staging Dock February 2005 Dredging May 2005 . Site Work August 2005 Construction-Boathouse/Staging Dock August 2005 Total Project Time 16 months Attachment III City of Edgewater Kennedy ParkPbase III Boundary Map/Sketch ~ I . s ~ I I ~ II . t 11111111' I I .1 J I " I c D I II ~III I J I I l.a . I I ,I Il~tt I II / ~ / Ii / '1'1 l'I"i"'I"'.'l'I'1 9 I 'I , --.._-,_.~-., /s / II ~ I111111 I- IIII1 Illill. / I I lilllll I I I I I I i I Jill; i I ; i I I / III II II Indian River North _Till V"TO!lf~y -- ~ UlClIlNDAAIIIlIIMA'I1ClIll II: ~.~ CIlI 1LA't. Ie _..'__ CL c.n-... .... __ --PO'" '__IlId_""'.._ClP1Ia_!' _. ' pt _.... "~...' " ... ......1'1'1.. .', alIlll:__ -. 11_ - ..~~~ ==- :.=-__ :-==.~ ~.-= p-. ....... _ '.IJt:"'_ ...___..__ - 11 & Associates . =- .... =:,... . ~-=.NlIUY_' .' ....- 1-..~ t- --, .. POBOX309 ---=:;...,.,.,_ ~:=-..... 1 BlXlBWA11!Il,FLS1tn !!!D~~_ .-_ ml ;;;. - -...... --- Attachment IV City. of Edgewater Kennedy Park Phase III Conceptual Site Plan -- ... -- ~ I d . Q1!J-.ll I( II to. .]] _ _~J II ............ . I :: ~f ~r+ f I " ~....::...:' II ---- :;- a. o' :J ;u l ., I ... ..... -- .. -- 1'-_ - ase George R. Kennedy Memorial Pork Edgewater, Volusta Count)'. Florida ....- -... --..JI!'t-__ ..". _ I I I I I I I I I I I I I I I I I I I I I I I I I _--1 I I o ... CD a. 10 CD > ... CD o .Il!c:kCl!o'dor ~ of ........ s,r.Iooo + fTIG') 0..(1) ~ 0 (1) .., ~\O o (1) .-+ tI) CD::::O;+ ~ . CD <^O-o o(1)CDI c5<)> fI)(1)~(/) -. 0.. 0 ,.,., 0,<"0'" ()7"3= o ~ CD - C (1) ::s ::s3.-+ '-+0 ':.< .., O' ::!J ~ -0 -.0 c...., o ^ I~ Ii il ~w Attachment V City. of Edgewater Kennedy Park Phase III Resolution '. ...., Jack Corder January 29, 2004 LETTER OF TRANSMITTAL The Edgewater City Council approved Resolution 2004-R-03 at their regular meeting held on, January 26, 2004. w d' th f4 11 hm f4 dfi dbl e are sen mg you e 0 owmg attac ents or actIOn as e me eow: ORIGINAL DESCRIPTION ACTION 1- certified copy of Resolution 2004-R-03 -(with original Exhibit 4.&5. A) Plus 11 copies of Resolution 2004-R-03 1. For your files 2. For execution & return 3. At your request 4. For review & action 5. See remarks ~ along with 11 e Resolution. I have attached a certified copy of Resolution 2004-R-03 with orig' copies of resolution 2004-R-03 please transmit as required in Se ~ ~_w_ Susan J. %dsworth, CMC City Clerk cc: City Manager Legal "11fE CITY OF ED~EWATER POST OFFICE BOX 100. EDGEWATER, FLORIDA 32132-0100 Mayor Donald A. Schmidt District 1 Councilman James P. Brown District 2 Councilman Dennis Vincenzi District 3 Councilwoman Harriet E. Rhodes District" Councilwoman Judith R. Lichter City Manager Kenneth Hooper City Attorney Scott Cookson City Clerk Susan J. Wadsworth CERTIFICATION I, Susan J. Wadsworth, City Clerk of the City of Edgewater, Florida, do hereby certify that the attached is a true and correct copy of Resolution 2004-R-03 as is appears in the public records of the City of Edgewater, Florida. IN WITNESS WHEREOF. I have set my hand and the seal of the City of Edgewater, Florida, this 28th day of January, 2004. ~~ S~ n J. 'wa:sworth. CMC- City Clerk SEAL 104 NORTH RIVERSIDE DRIVE FAX-(386)424-.2409 SUNCOM 383-2407 CITY CLERK-(386)424-2407