Loading...
87-R-27RESOLUTION NO. 87-R-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS OF THE CITY OF EDGEWATER, FLORIDA, TO EXECUTE AMENDMENT NO. 4 TO THE AGREEMENT FOR CONSULTING ENGINEERING SERVICES WITH DYER, RIDDLE, MILLS & PRECOURT, INC.; REPEALING ALL RESOLUTIONS IN CONFLICT HEREWITH AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA: SECTION 1: That the City Council of the City of Edgewater, Florida, authorizes the appropriate officials of the City of Edgewater, Florida, to execute Amendment No. 4 to the Agreement for Consulting Engineering Services with Dyer, Riddle, Mills & Precourt, Inc. SECTION 2: A copy of said Amendment No. 4 is attached to this Resolution and by reference incorporated herein as if fully set forth. SECTION 3: That all Resolutions or parts of Resolutions in conflict herewith be and the same are hereby repealed. SECTION 4: That this Resolution shall take effect immediately upon its adpoption by the City Council of the City of Edgewater, Florida, at a regular meeting of said Council held on the 4th day of May , 1987, and approved as provided by law. This Resolution was introduced and sponsored by Councilman Mitcham , and was read and passed by a vote of the City Council of the City of Edgewater, Florida, at a regular meeting of said Council held on the 4th day of May 1987, and approved as provided by law. ROLL CALL VOTE AS FOLLOWS: Ma vnr �= c � Yy Councilman ne ree Councilman -Zone Four h.V4043C City Clerk Authenticated this 4th day of May , 1987. Mayor � This Resolution repared by: y At orney Res. No. 87-R-27 AMENDMENT NO. 4 PRELIMINARY DESIGN ACTIVITIES FOR THE CITY OF EDGEWATER WESTERN WELLFIELD AND WATER TREATMENT PLANT EXPANSIONS MAY 1987 DATEDOeoembee 4, 4986 This AMENDMENT made and entered into this 4 day of December, 1986, amends the consulting engineering AGREEMENT for professional services between the CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA (hereinafter referred to as "CITY"), and DYER, RIDDLE, MILLS & PRECOURT, INC. (hereinafter referred to as "CONSULTING ENGINEER") to perform preliminary design activities relative to the expansion of the CITY's western wellfield and the CITY's western water treatment plant; WHEREAS, this AMENDMENT shall incorporate all of the conditions and requirements of the original CONTRACT between the CONSULTING ENGINEER and the CITY, dated October 3, 1985; Provisions delineated in the October 3, 1985 AGREEMENT shall remain in full force without modification. In case cf conflict this AMENDMENT shall prevail. This AMENDMENT provides for certain professional consulting engineering services relative to the CITY's water system. The services provided in this AMENDMENT include, but at not limited to providing preliminary design, submittals, analysis, and recommendations for the CITY's water system facility needs. As directed by the designated CITY representative to the CCNSULTING ENGINEER, confirmed by the CITY's work order, the scope of services and professional engineering compensation as delineated in Exhibit "A" are made part of this AMENDMENT. EXHIBIT 'A' CITY OF EDGEWATER DRMP WORK ORDER DESCRIPTION Project Name: Western Wellfield Expansion Program Project Rationale: As the City's population continues to grow, demands on the eastern and western wellfields will likewise continue to increase. Due to regulatory constraints (St. Johns River Water Management District), the western wellfield must be studied to determine its maximum permittable withdrawal rates. Expansion of the western wellfield is an option that the City has decided to pursue to be able to meet its projected demands. A water resources study would be conducted to determine the feasibility of expanding the western wellfield further west and to determine optimum well spacing and withdrawal rates to increase the potable water supply capacity to 6 to 12 MGD range. Project Scope: Description General geologic data acquisition, utilize data from western wellfield drilling and testing. Prepare conceptual plan for water resources study to determine optimum well locations and withdrawal rates. Design wellfield layout and preliminary schematic. Construct groundwater model to determine impacts on Floridan aquifer; used in CUP process. Simulate wells withdrawing at various rates (6 to 12 MGD range)to determine impacts at maximum day and ADF rates; used to support CUP renewal/modification. Simulate withdrawals at various locations (as determined from test drilling) to determine optimum well siting. Write water resources report delineating optimum well locations and withdrawal rates based on groundwater modeling, regulatory input and well optimization studies. Locate and drill test wells to 300 ft. for well siting. Actual drilling will be sub -contracted. Bidding and certification of drills for test wells. Construction inspection of test well drilling; includes drilling 4 wells. Letter type report on drilling results. Project Duration: The water resources study and testing activities are estimated to require 6 months for completion. Project Compensation:The labor cost for the project is $16,873.00. The Other Direct Costs are $997.00. The total for the project is $17,870.00. co,trac= Cosa. ,stimate other direct costs 10 code elienl/eontractA ne Aem dale 85-304.00 11-7-fS6 client name lob name tsubdwiAoni review a approval/date City of Edgewater W t r Winter Tre,,rmenr Plant budgeting work group divisionreview a approval/dale no. Environmental prepared by:C. Hartman /region Environ./Orlando TRAVEL 1. no. air fares origin/destination round trip late element cost total 2. other transport Company Veh21 - 170 m lei/rrin x 10 trips = 1200 miles 7. rental car _ days at S _ /day 4. taxi. tolls a parking _tlays at S _ /day subtotal ;ransppna:ion inflation allowance — 5, meals and -lodging I I P 4 total transportation $240.00 10 days in Edgewater city at S 1S. /day $150.00 inflation allowance _ % $150.00 total Per them OTHER COSTS xerox 4560 copies a! 9.10/copy $456.00 printing a photo 200 pages at s I /page 200•00 1� drawings at s /orawing 100'00 telephone s 50 /month for S months 200'00 computer _ hrs at s __ !hr 01ne, Postage Binders Punches etc. ---- 150.00 subtotal Other costs inflation miowance _--- total other Costs $1 106 TOTAL OTHER DIRECT COSTS$11496.00 C h� EXHIBIT 'A' CITY OF EDGEWATER DRMP WORK ORDER DESCRIPTION Project Name: Western Water Treatment Plant Expansion Program Project Rationale: The Park Avenue Water Treatment Plant was expanded on an interim basis, blending raw water with softened water to accommodate demands and minimizing the water treatment costs associated therewith. A major capital investment associated with the Park Avenue Water Treatment Plant Program involved the upgrade of the facilities for a permanent major pumping station for the City. As consumptive demands increase, the City will need additional water treatment from a central facility. The Western Water Treatment Plant is envisioned to be the permanent long-term expandable facility to meet the needs of the decades to come. A facility located to the west of the City will permit an adequate distribution of potable water to the customers within the service area of the City of Edgewater. Moreover, define the utilization of the existing Park Avenue Facilities which would be incorporated in the overall distribution network. Moreover, water resources on the west of 1-95 in the S.R. 442 area are much more favorable for continued water supply development than in the Park Avenue Area. Project Scope: The project shall be conducted in three major phases: A. Preliminary design phase. B. Final design phase. C. Construction services and start-up phase. Phases B and C are predicated on the results of Phase A, concerning the preliminary design of the necessary facilities. The remainder of this work order shall address the Phase A component of the project. Preliminary Design Services: 1. Incorporate hydrogeological plan into a facilities plan for raw water supply. 2. Assist the City in locating an appropriate site for the water treatment plant from a facilities accommodation standpoint only. 3. Develop alternate plot plan and facility plan scenarios for phasing schedules meeting the projected water demands supplied by the City or Marshall Engineers. 4. Evaluate alternate processes and develop concept plan for process. 5. Detail overall facilities scenarios and describe the phases and costs associated with each phase. 6. Consider water quality aspects and regulatory compliance, both hydrogeologically, standards of practice, water quality and reliability. 7. Develop construction costs and operating costs for the planned facility. B. Develop water system pro forma to accommodate the expansion program. 9. Develop and present alternative implementation scenarios with alternative sources of funding. 10. Summarize above in a design report and present the same to the City for the water treatment plant expansion. 11. Delineate schedules, activities and costs, as well as permitting features for the program. Project Duration: The Phase A - Preliminary Design Activities shall be completed within four (4) months from the notice to proceed. Project Up -Set Limit Compensation: This project will be invoiced on a monthly basis utilizing the hourly rates and charges set forth in previous agreements with the City. The total upset limit for the above project is f27,620.00. other direct costs 10 code client/eontraCIAme Item tlalC AS 304 00 11-7-86 client name lob name tsubdmslOnl review d aPPrOval/date C'ty of Edgewater Western Wellfield Exoansion— budgeting work group C. Drake division review L approval/dale no. Environmental prepared by: C. Hartman /region.Environ./Orlando TRAVEL i. no. air fares origin/destination round trip late element cost total 2. other transport Company Vehicle - 120 miles/trio- 4 13 trips = 1,560 miles 3. rental car _ days at S __ /day 4. .taxi. tolls d parking _ days at S —_ /day subtotal transportation inflation allowance — S n 2n/mile $ 312.00 total transportation it 7n7 fin 5, meals and -lodging R days in Erinewator city at S ,.rL. /day $ 120.00 inflation allowance _ % OTHER COSTS Xerox printing s photo telephone computer other 4,750 copies at S0.10'coPY pages at S _. /Page drawings at S — /drawing S 15 /month for 6 months firs at S _ .hr S.blolal pine, costs Inflation allowance -_ total per diem $&0 $ 475.00 total other costs $ 565.00 TOTAL OTHER DIRECT COSTS $ 997.00 OL v 111 11111 I i t 1 IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this AMENDMENT No. 4 upon the terms and conditions stated In the AGREEMENT dated October 3, 1985. Dyer, Riddle, Mills & Precourc, inc B c. Vice President CITY OF EDGEWATER, FLORIDA 1 Witn ss 2 B Witness City Administrator GCH/RP/cb Attachments