85-R-44cc a RESOLUTION NO. 85-R-44 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA, AUTHORIZING THE APPRO- PRIATE CITY OFFICIALS OF THE CITY OF EDGEWATER TO EXECUTE AMENDMENT NO. 2 TO THE AGREEMENT FOR CONSULTING ENGINEERING SERVICES WITH DYER, RIDDLE, MILLS & PRECOURT, INC. AND MARSHALL, ENGINEERS; REPEALING ALL RESOLUTIONS IN CONFLICT HEREWITH, AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA: SECTION 1: That the City Council of the City of Edgewater, authorizes the appropriate officials of the City of Edgewater, Florida, to execute Amendment No. 2 to the Agreement for Consulting Engineering Services with Dyer, Riddle, Mills & Precourt, Inc. and Marshall, Engineers. ,,��QQ�� ,,��,,,,,,,,77pp��yy�� SECTION 2: A copy of said Amendment dated i41"etvem_"bes_a_,1985, is attached to this Resolution and by reference incorporated herein as if fully set forth. Said Amendment No. 2 includes Exhibit "A", Scope of Services; Exhibit"B", Estimated Construction Cost; and Exhibit "C", Compensation. SECTION 3: That all Resolutions or parts of Resolutions in conflict herewith be and the same are hereby repealed. SECTION 4: That this Resolution shall take effect immediately upon its adoption by the City Council of the City of Edgewater, Florida, at a meeting of said Council held on the ` _4 day of ,198_6__, and approved as provided by law. This Resolution was introduced and sponsored by J and was read and passed by a vote 'o'' f�����the City Council of the City of Edgewater, Florida, at apA0""""meeting of said Council held on the�day of kjajio, ,198_,�, and authenticated as provided by law. ROLL CALL VOTE AS FOLLOWS: CITY CLERK , , T. GW1V l:1 LCIl4V - LUNG TWU I COUNCILMeP- Z/O STHREE C UNCILMAN - ZONE FOUR DYER,RIDDLE,MILLS & PRECOURT, INC. Engineers - October 27, 1985 Mr. Terry Wadsworth Director of Utilities City of Edgewater P.O. Box 100 Edgewater, Florida 32032 Subject: Amendment No. 2 - Final Design Activities for the City of Edgewater Well Field and Water Treatment Plant Dear Mr. Wadsworth: Amendment No. 1 to the contract between the City of Edgewater, Dyer, Riddle, Mills 6 PreCOUTt, Inc. (DAMP), and Marshall, Engineers entailed the preliminary design activities relative to the water improvement program. This Amendment provides for the final design activities relative to the design of water supply wells, well pumps, piping and appurtenances, raw water transmission, and the water treatment plant expansion or improvements at the Park Avenue site. We are forwarding this submittal to you for your review and discussion prior to City Council consideration. If you have any questions or comments relative to the attachment, do not hesitate to give either Frank or me a call. DRMP will be involed in the well design, well pumps, piping and appurtenances, and the water treatment plant design. Marshall Engineers will be involved in the raw water transmission facilities design. Since each one of the four components are distinctly different in construction activities with specialty contractors, it is more cost-effective to bid the projects and administer them as individual contracts for well construction, well equipping, raw water transmission and treatment plant improvements. Very truly yours, Ystsbullgnlaee5s� der. Riddle, Mills: Pteco Prank E. Marshall, P.E. Wrald C. Hartman, P.E. President Vice President GCH/ch Attachment 1505 EAST COLONIAL DRIVE -SUITE 200. ORLANDO, FLORIDA 328034780• TEL 13051896-0594 PRINCIPALS. DONALDSON N. BARTON • WILLIAM B. DYER • GERALD C. NARTMAN - RUSSLLL L MILLS • A PREOOURT • ROBERT A RIDDLE • REGINALD L TISDALE AMENDMENT NO. 2 FINAL DESIGN ACTIVITIES FOR THE CITY OF EDGEWATER WELL FIELD, RAW WATER TRANSMISSION AND WATER (TREATMENT PLANT DATED 14959ik6 ' 9 . 1985 This AMENDMENT made and entered into this"` 'day of eN vemer, 1985, amends the consulting engineering AGREEMENT for professional services between the CITY COUNCIL OF THE CITY OF EDGEWATER, FLORIDA (hereinafter referred to as "CITY"), and MARSHALL, ENGINEERS, and DYER, RIDDLE, MILLS & PRECOURT, INC. (hereinafter referred to as "CONSULTING ENGINEERS") to perform final design activities relative to the expansion of the CITY's well field, well pumps piping and appurtenances, raw water transmission facilities, and the expansion to the CITY's water treatment plant; WHEREAS, this AMENDMENT shall incorporate all of the conditions and requirements of the original CONTRACT between the CONSULTING ENGINEERS and the CITY, dated October 3, 1985; Provisions delineated in the October 3, 1985 AGREEMENT shall remain in full force without modification. In case of conflict this AMENDMENT shall prevail. This AMENDMENT provides for certain professional consulting engineering services relative to the CITY's water system. The services provided in this AMENDMENT include, but are not limited to providing design, and final construction permit submittals, analysis, and recommendations for the CITY's immediate water system facility needs. As directed by the designated CITY representative to the CONSULTING ENGINEERS, confirmed by the CITY's work order, the scope of services as delineated in Exhibit "A", the expected project cost as delineated in Exhibit "B", and the professional engineering compensation as delineated in Exhibit "C" are made part of this AMENDMENT. 1 of IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this AMENDMENT No. 2 upon the terms and conditions stated in the AGREEMENT dated October 3, 1985. Witnesses DYER, RIDDLE, MILLS & PRECOURT, INC. • �/ ByVice President Witnesses Witnesses GCH/cb Attachments MARSHALL, ENGINEERS CITY OF EDGEWATER, FLORIDA 2 of EXHIBIT "A" SCOPE OF SERVICES AMENDMENT NO. 2 DATEDei ?, , 1985 1. Raw Water Supply Wells - DRMP #85-304.AB A. Prepare final design for four (4) additional water supply wells and the pulling and rehabilitation of wells #4 and #5. B. Prepare technical specifications for water supply wells. C. Prepare contract documents suitable for bidding for water supply wells. D. Submit Florida Department of Environmental Regulation permit application for water supply wells. E. Assist the City of Edgewater in advertising for responsible contractors. F. Answering questions during bidding. G. Preparation of final design cost estimate. H. Recommendation of award to'lowest responsible bidder. 1. Construction management services for the City of Edgewater as appropriate will be an additional cost. 11. Well Pumps, Piping and Appurtenances - DRMP #85-304.AB A. Preparation of final design plans. B. Preparation of technical specifications. C. Preparation of contract documents. D. Preparation of Florida Department of Environmental Regulation permit application. E. Assistance in advertisement for responsible bidders. F. Answering questions during the bidding process. G. Preparation of engineer's final design cost estimate. H. Recommendation of award to lowest responsible bidder. 1. Construction management services will be an additional cost. AMENDMENT NO. 2 A-1 111. Raw Water Transmission Facilities A. Prepare Preliminary Design Report and Preliminary Cost Estimate. B. Preparation of final design plans for the proposed raw water transmission facilities. C. Preparation of technical specifications. D. Preparation of contract documents. E. Preparation of Florida Department of Environmental Regulation permit and other required permits. F. Assistance in advertising and bidding the project. G. Answer questions during the bidding process. H. Final design cost estimate. 1. Recommendation of award to lowest responsible bidder. J. Construction management services will be an additional cost. IV. Expansion of Water Treatment Plant From 1.4 MGD to 2.4 MGD - DRMP #85-304.AC A. Preparation of final design plans. B. Preparation of technical specifications. C. Preparation of contract documents. D. Preparation of Florida Department of Environmental Regulation permit application. E. Assistance in advertisement for responsible bidders. F. Answering questions during the bidding process. G. Preparation of engineer's final design cost estimates. H. Recommendation of award to lowest responsible bidder. 1. Construction management services will be an additional cost. AMENDMENT NO. 2 A-2 EXHIBIT "B" ESTIMATED CONSTRUCTION 1COST AMENDMENT NO. 2 DATED NA"R 2. .1985 The following estimates of construction costs have been prepared as a result of preliminary design activities: 1. Water Supply Wells - DRMP #85-304.AB A. Four (4) wells $80,000 B. Miscellaneous (mobilization, sites, etc.) 5,000 C. Pulling existing wells #4 and #5 3,000 D. Rehabilitation of equipment 5,000 E. Acidization of wells to improve yield 12,000 Estimated Cost $105,000 11. Well Pumps, Piping and Appurtenances - DRMP #85-304.AB A. Four (4) Wells Pump and motor $10,000 4" turbine meter 2,000 8-90° bends 6" diameter 1,000 Miscellaneous pipe - 6" diameter 1,000 Check valve 6" 1,000 Air release valve 1,000 Pressure gauge and corporation cock hose bib 500 Air line 500 Victaulic coupling 500 Pedestals and pipe hanger/supports 1,500 Slab 2,000 Fence 1,000 Motor control RTU 5,000 Gravel and plastic 1,000 Electric drop and connection 1,500 Light 500 Auxiliary plug 1,000 Sitework and grading 500 Subtotal $31,500 For Four (4) Wells $126,000 AMENDMENT NO. 2 B-1 B. Well Field Piping Approximately 2,500 linear feet of 12" diameter with fitting and valves $50,000 C. Motor control RTU's for existing wells #4 and #5 $10,000 D. Miscellaneous (mobilization, bonds, cont., insurance, etc.) $16,500 Estimated Cost $202,500 III. Raw Water Transmission A. 20" DIP transmission main $127,500 B. 10" PVC raw water main $248,000 C. Crossings $50,000 D. Miscellaneous $23,000 Estimated Cost $425,500 IV. Water Treatment Plant Expansion - DRMP #85-304.AC Park Avenue Water Treatment Plant Expansion to 2.4 MGD Site work, clearing and grubbing $20,000 85' diameter Crom storage tank Lime Mkef-a U -- tan 170,000 11#79 $S10U0 0.5 MGD Accelopak 80,000 Block pump and ammonium feed building 85,000 Filter 60,000 Clearwell 10,000 Ammonia supply tank 6,000 Yard piping 75,000 Stabilized roads 10,000 Lime sludge basins 37,000 Chemical feed lines 16,000 N113 system and feeder 11,000 New pumps, motors and controls 38,000 New 12" venturi meter and recorder 22,000 Sodding 3,000 Architectural finishes 12,000. Electrical (Miscellaneous) 60,000 Pump gantry 2,000 Drainage facilities 17,000 Instrumentation 50,000 Miscellaneous (mobilization, bonds, insurance, etc.) 11,000 Estimated Cost $ �5O, 0e. ° 4061r. AMENDMENT NO. 2 B-2 EXHIBIT •C• COMPENSATION „�,.„,� AMENDMENT NO. 2 DATED A�t?, 1985 The compensation by the CITY to the CONSULTING ENGINEERS shall be en a multiplier basis with the following up -set limits. A 1.95 multiplier to payroll costs will be used for the labor related costs and other direct costs (expenses) shall be invoiced at cost. This compensation exhibit r ate specifically to EXHIBIT "A" and EXHIBIT "B" of AMENDMENT NO. 2, dated N6i 9,, 1985. 1. Raw Water Supply Wells - DRMP #85-304.AB A. Consulting engineering fees $6, 500 B. Surveys and legal descriptions (by others) $800 Il. Well Pumps, Piping and Appurtenances - DRMP #85-304.AB A. Consulting engineer's fees $10,000 B. Survey and other included in items 1. and Ill.q N/A Ill. Raw Water Transmission Facilities A. Consulting engineering fees $20,000 B. Survey $15,000 IV. Expansion of Water Treatment Plant From 1.4 MGD to 2.4 MGD - DRMP #85-304.AC A. C/onsulting engineering fees $54,600 B. Survey $1,500 AMENDMENT NO. 2 C-1