Loading...
Edgewater LayoutThe pink area would be a climate controlled building. We’d like to get that to be close to 22‐24k  total sq footage. That will depend on the area there and how to best place it with existing  undergrounds. The Blue outlines will be proposed drive up storage.     The below plan would avoid any construction over existing leach fields.               If we went with the below, we would have to move a few existing leach fields. Likely tie them  into sewer.