82-O-22'to ., 0 -fib"
ORDINANCE NO. 82-0-22
AN ORDINANCE OF THE CITY OF EDGEWATER,
FLORIDA, AMENDING SECTION 19-41 OF THE
EDGEWATER CODE OF ORDINANCES TO PROVIDE
FOR AN INCREASE IN DEVELOPMENT FEES
CHARGED TO NEW USERS OF THE WATER AND
WASTE WATER SYSTEM FROM $200.00 TO
$400.00 FOR WATER AND $400.00 FOR SEWERAGE,
REPEALING ALL ORDINANCES IN CONFLICT HERE-
WITH AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, The City Council has authorized an engineering
study concerning the justification for water and sewer
development fees, and
WHEREAS, The report of the consulting engineers, using
models and scales, demonstrated that the development fee
schedule was inadequate to meet the need of expanding the water
and waste water system, and
WHEREAS, The report showed that the development fee
schedule could be raised as high as $600 for both water and
sewerage,
NOW THEREFORE, BE IT ENACTED BY THE PEOPLE OF THE CITY OF
EDGEWATER, FLORIDA:
SECTION 1: That Section 19-41 of the Edgewater Code of
Ordinances is hereby amended to read:
Sec. 19-41 FEE SCHEDULE
There is hereby imposed a development fee based on the
city council's determination of the equitable portion of the
cost
of financing the extension of the system upon the equivalent
living unit responsible for the need for additional system
financing.
The fees shall be as follows:
(a) For each equivalent living unit connected to the system:
Water service development fee $400.00
Sewer service development fee 400.00
Total for both services B00.00
(b) For each equivalent living unit constructed in areas served
by privately owned water distribution systems using the city
water supply only:
Water service development fee $400.00
0
(c) For each equivalent living unit with prior water service
connected to the sewer collection system only:
Sewer service development fee $400.00
Each additional equivalent living unit occasioned by changes in
property usage subsequent to the effective date of this article
shall be subject to a development fee computed in accordance
with
the foregoing criteria. (Ord. No. 80-0-43, 1, 3-10-80)
SECTION 2. That all Ordinances or parts of ordinances in
conflict herewith be and the same are hereby repealed.
SECTION 3. That this ordinance shall take effect
immediatetly upon adoption as provided by law.
The Ordinance was introduced by Mr.
The Ordinance was read for a first time and passed by a
majority vote of the Edgewater City Council at a regular
meeting thereof held on the _ day of , 1982, and
authenticated as provided by law.
The Ordinance was read for a Second time and adopted by a
majority vote of the Edgewater City Council held on the
day of , 1982, and authenticated as provided by
law.
ROLL CALL VOTE AS FOLLOWS:
The vote on the above and foregoing Ordinance No.
following first Reading thereof was as follows:
MAYOR Robert H. Christy
ZONE ONE COUNCILMAN
Jacob Lodico
ZONE TWO COUNCILMAN
DavU Ledbetter
ZONE 'THREE COUNCILMAN
Wilbert Pendleton
ZONE FOUR COUNCILMAN
John `Wilbur
The roll call vote on second reading of the Ordinance, following
a duly advertised public hearing was as follows:
MAYOR Robert H. Christy
ZONE ONE COUNCILMAN
Jacob Lodico
ZONE TWO COUNCILMAN
David Ledbetter
ZONE THREE COUNCILMAN
Wilbert Pendleton
ZONE FOUR COUNCILMAN
John Wilbur
ATTEST:
CITY CLERK
Authenticated this day of
981.
MAYOR
Approved for legality and form:
Wm. Clay Henderson
CITY ATTORNEY
Gl
Survey of Development or Impact Fees
or
Selected Cities in
Vo usia County
Conducted in April, 1982
Development or
Impact
Fee
CITY
WATER
SEWER
OTHER
FEES
TOTAL
Ormond Beach
$550
$425
$100
Tap Fee
$1,075
golly Hill
$263
$363
S 41
Connection
$667
South Daytona
$273
$335
$150
Water Con.
$ 993
$235
Sewer Con.
(Single
Family)
Daytona Beach
$150
$200
$35-$150
Tap Fee
$355-$500
Daytona Beach Shores
*
$380
$380
Ponce Inlet
$900
**
$900
Port Orange
$430
$253
$683
Dtew Srlvrna 3^ach
$400
S400
$150
Connection
$957.50
$7.50
Service Charge
- Ed;ewater
$200
$200
-$250
Water Con.
$845
$150
Sewer Con.
with
$45 Surcharge
*Daytona Beach Shores currently
buys water
from
Daytona Beach and Port
Orange.
-
-
**Ponce Inlet is served
by a private utility
Company for sewer.
_
c
ORDINANCE NO. 82-0-22
AN ORDINANCE OF THE CITY OF EDGEWATER,
FLORIDA, AMENDING SECTION 19-41 OF THE
EDGEWATER CODE OF ORDINANCES TO PROVIDE
FOR AN INCREASE IN DEVELOPMENT FEES
CHARGED TO NEW USERS OF THE WATER AND
WASTE WATER SYSTEM FROM $200.00 TO
$400.00 FOR WATER AND $400.00 FOR SEWERAGE,
REPEALING ALL ORDINANCES IN CONFLICT HERE-
WITH AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, The City Council has authorized an engineering
study concerning the justification for water and sewer
development fees, and
WHEREAS, The report of the consulting engineers, using
models and scales, demonstrated that the development fee
schedule was inadequate to meet the need of expanding the water
and waste water system, and
WHEREAS, The report showed that the development fee
schedule could be raised as high as $600 for both water and
sewerage,
NOW THEREFORE, BE IT ENACTED BY THE PEOPLE OF THE CITY OF
EDGEWATER, FLORIDA:
SECTION 1: That Section 19-41 of the Edgewater Code of
Ordinances is hereby amended to read:
Sec. 19-41 FEE SCHEDULE
There is hereby imposed a development fee based on the
city council's determination of the equitable portion of the
cost
of financing the extension of the system upon the equivalent
living unit responsible for the need for additional system
financing.
The fees shall be as follows:
(a) For each equivalent living unit connected to the system:
Water service development fee $400.00
Sewer service development fee 400.00
Total for both services 800.00
(b) For each equivalent living unit constructed in areas served
by privately owned water distribution systems using the city
water supply only:
Water service development �feeee ® $400.00
/1
(c) For each equivalent living unit with prior water service
connected to the sewer collection system only:
Sewer service development fee $400.00
Each additional equivalent living unit occasioned by changes in
property usage subsequent to the effective date of this article
shall be subject to a development fee computed in accordance
with
the foregoing criteria. (Ord. No. 80-0-43, 1, 3-10-80)
SECTION 2. That all Ordinances or parts of ordinances in
conflict herewith be and the same are hereby repealed.
SECTION 3. That this ordinance shall take effect
immediatetly upon adoption as provided by law.
The Ordinance was introduced by Mr.
The Ordinance was read for a first time and passed by a
majority vote of the Edgewater City Council at a regular
meeting thereof held on the day of , 1982, and
authenticated as provided by law.
The Ordinance was read for a Second time and adopted by a
majority vote of the Edgewater City Council held on the
day of , 1982, and authenticated as provided by.
law.
ROLL CALL VOTE AS FOLLOWS:
4
d
ORDINANCE NO. 82-0- as /�v �1-
AN ORDINANCE OF THE CITY OF EDGEWATER,
FLORIDA, AMENDING SECTION 19-41 OF THE
EDGEWATER CODE OF ORDINANCES TO PROVIDE
FOR AN INCREASE IN DEVELOPMENT FEES
CHARGED TO NEW USERS OF THE WATER AND
WASTE WATER SYSTEM FROM $200.00 TO
$400.00 FOR WATER AND $400.00 FOR SEWERAGE,
REPEALING ALL ORDINANCES IN CONFLICT HERE-
WITH AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, The City Council has authorized an engineering
study concerning the justification for water and sewer
development fees, and
WHEREAS, The report of the consulting engineers, using
models and scales, demonstrated that the development fee
schedule was inadequate to meet the need of expanding the water
and waste water system, and
WHEREAS, The report showed that the development fee
schedule could be raised as high as $600 for both water and
sewerage,
NOW THEREFORE, BE IT ENACTED BY THE PEOPLE OF THE CITY OF
EDGEWATER, FLORIDA: _
SECTION 1: That Section 19-41 of the Edgewater Code of
Ordinances is hereby amended to read:
Sec. 19-41 FEE SCHEDULE
There is hereby imposed a development fee based on the
i
city council.'s determination of the equitable portion of the
cost
of financing the extension of the system upon the equivalent
living unit responsible for the need for additional system
financing.
The fees shall be as follows:
(a) For each equivalent living unit connected to the system:
Water service development fee $400.00
Sewer service development Fee 400.00
Total for both services BOO.00
(b) For each equivalent living unit constructed in areas served
by privately owned water distribution systems using the city
water supply only:
Water service development fee $400.00
ti
J
(c) for each equivalent living unit with prior water service
connected to the sewer collection system only:
Sewer service development fee $400.00
Each additional equivalent living unit occasioned by changes in
property usage subsequent to the effective date of this article
shall be subject to a development fee computed in accordance
with
the foregoing criteria. (Ord. No. 80-0-43, 1, 3-10-80)
SECTION Z. That all Ordinances or parts of ordinances in
conflict herewith be and the same are hereby repealed.
SECTION 3. That this ordinance shall take effect
immediatetly upon adoption as provided by law.
The.Ordinance was introduced by Mr.
The Ordinance was read for a first time and passed by a
majority vote of the Edgewater City Council at a regular
meeting thereof held on the day of , 1982, and
authenticated as provided by law.
The Ordinance was read for a Second time and adopted by a
majority vote of the Edgewater City Council held on the
day of , 1982, and authenticated as provided by
law.
ROLL CALL VOTE AS FOLLOWS:
Survey of Development or Impact Fees
tor
Selected Cities in
Vo usia County
Conducted in April, 1982
Development or
Impact
Fee
CITY
WATER
SEWER
Ormond Beach
$550
$425
Holly Hill
$263
$363
South Daytona
j
$273
$335
Daytona Beach
$150
$200
Daytona 3each Shores
*
$380
t Po -e inlet
$900
**
Port Orange
$430 _
$253
new Srlyrna Beach
$400
"S400
Edcewater
$200 $200
OTHER FEES
$100 Tap Fee
$ 41 Connection
$150 Water Con.
$235 Sewer Con.
(Single Family)
TOTAL"
$1 ;075
$ :667
$ 993
S35-$150 Tap Fee $385-S500
$380
$900
$683
$150 Connection $957.50
$7.50 Service Charge
-S250 Water Con. $845
$150 Sewer Con.
with $45 Surcharge
*Daytona Beach Sho es`2urrently buys water from
.--- Daytona Beach and Port Orange.
**Ponce Inlet is served by a private utility
Company for sewer.