Loading...
FEC Right-of-Way - Drainage Pipe Relocation - 03-23-1995ch . 4 29 a 3�, o Light • '` o, •• ��'' :Edgewater wl � • j pt ter.;:, � -- - • , �.:. - � �.�� - '� U '\1 5\ ��t• \ � �_.:.>'c \�• ~ ,%•�•• • n , Th ter to F 1 if — C 7 i•;.•�' o Dal tom\ 4 _ , `ram". -�' a�I �i ' , •i� . , \ a '� .' S. \ \ • • •\�11 .7 IA o\ I \ LOCATION MAP SCALE: 1 "= 2000' KEY MA P SCALE: 1 "= 400' BENCHMARK: NAIL IN EAST SIDE OF POWER POLE, ELEV. 9.76 APPROX. 712' WEST TO CL OF CANAL G5 PROJECT LOCATION DRAINAGE PIPE RELOCATION SITE PLAN -EXISTING CONDITIONS SCALE: 1 $1= 50' DESIGNED I KWF DRAWN I BVB CHECKED DATE: 3/23/95 SQ9L& AS NOTED SHEET NO. 1 OF 2 CITY OF EDGEWATER E1�lGiNLRING DEPARTMENT NO. I DATE REVISION DESCRIPTION BY IREV. NO.1 DATE REVISION DESCRIPTION LM i - rv��•, GENERAL NOTES 1. BENCHMARK DATUM & ELEVATIONS SHOWN REFER TO NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD-29) & BASED ON USC&GS MONUMENT U-211 PUBLISHED ELEV. 14.006. BENCHMARK INFORMATION WAS OBTAINED FROM PLANS ENTITLED "EDGEWATER MARINE & FABRICATORS INC.-FLAGLER AVE. WATER LINE EXTENSION", SHT. 3 OF 3, BY DANIEL W. CORY SURVEYOR, INC. 300 CANAL ST. NEW SMYRNA BEACH, FLA. 32168, PROJECT jf3020C DATED 11124194. 2. THE CITY SHALL CONTACT THE FLORIDA EAST COAST RAILWAY COMPANY, 1-800-342-1131 AT A MINIMUM OF TWO WEEKS PRIOR TO CONSTRUCTION FOR THE PURPOSE OF SCHEDULING AN F.E.C. INSPECTOR/WATCHMAN. J. IF UPON EXPOSING THE EXISTING STORMWATER PIPES IT IS EVIDENT THE PIPES ARE DAMAGED BEYOND REPAIR, THEY SHALL BE REPLACED WITH PIPES OF SAME DIAMETER & MATERIAL. 11 TRACKS RAILROAD BED 12 TR, ACKS .................. .................. .................. .................. 8 PIPE N0. 5 36 CMP 6 WATER (AS LEI/EL OF 3/2 ELEV. 3. /95) 1 ¢ 2 SECTION B-B PROFILE (EXISTING SCALE: 1 1 CONDITIONS) 5HORIZONTAL 2' VERTI CAL TABLE OF D/MENSIONS AND QUANTITIES FOR ONE ENDWALL SIZE OF PIPE H T A B C F X ONE PIPE CULVERTS TWO PIPE CULVERTS THREE PIPE CULVERTS FOUR PIPE CULVERTS L RIPRAP Cy L R/PRAP Cy L RIPRAP Cy L RIPRAP CY CP CMP CP CMP CP CMP CP I CMP 18" 2'-3" 1 '-0" 4'-0" 0'-00 0'-0" 1 '-9" 2'-10" 8'-9" 1.2 1.2 11 '-7" 1.5 1.6 14'-5" 1.8 1.9 17'-3" 2.1 2.3 24" 2'-9" 2'-0" 2'-0" 2'-6" 0'-0" 1 '-9" 3'-5" 10'-3" 2.4 2.5 13'-8" 3.0 3.2 17'-1 " 3.7 4.0 20'-6" 4.3 4.7 30" 3'-4" 2'-0" 2'-0" 3'-2" 0'-0" 1 '-10" 4'-3" 12'-0" 3.3 3.4 16'-3" 4.2 4.5 20'-6" 5.1 5.5 24'-9" 6.0 6.5 36" 3'-10" 2'-0" 2'-0" 3'-8" 0'-0" 1 '-10" 5'-1 " 13'-6" 4.0 4.2 18'-7" 5.2 5.7 23'-8" 6.3 6.9 1 28'-9" 7.4 8.2 42" 4'-5" 3'-0" 2'-0" 2'-0" 2'-4" 1'-11" 6'-0" 15'-3" 6.4 6.7 21'-3" 8.3 8.9 27'-3" 10.2 11.2 33'-3" 12,j 13.4 48" 4'-11" 3'-0" 2'-0" 2'-0" 2'-10" 1 '-11 " 6'-9" 16'-9" 7.7 8.1 23'-6" 10.0 10.8 30'-3" 12.3 13.5 37'-0" 14.5 16.2 54" 5'-6" 3'-0" 2'-0" 2'-0" 3'-6' 2'-0" 7'-8" 18'-6" 9.5 10.1 26'-2" 12.4 13.5 33'-10" 15.3 17. 0 41 '-6" 18.2 20.4 60" 6'-0" 3'-0" 2'-0" 2'-0" 4'-0" 2'-0" 8'-6" 20'-0" 11.0 11.7 28'-6" 14.4 15.8 37'-0" 17.8 19.8 45'-C 21.1 23.8 66" 6'-7" 3'-0" 2'-0" 2'-0" 4'-8" 2'-1 " '- " 21 '-9" 13.2 14.1 31 '-0" 17.2 18.9 40'-3" 21.2 23.7 49'-6" 25.1 28.5 72" 7'-1 " I 3'-0" 2'-0" 2'-0" 5'-2" 2'-1 " 10'-0" 23'-3" 15.0 16.0 33'-3" 19.4 21.4 43'-3" 23.9 26.8 53'-3" 28.3 32.3 78" 7'-8" 3'-0" 2'-0" 2'-0" 5'-10" 2'-2" 10'-9" 5'-0" 17. 18.7 35'-9" 22.6 25.0 46'-6" 27.8 31.3 57'-3" 32.9 37.6 84" 8'-2" 3'-0" 2'-0" 2'-0" 6'-4" 2'-2" 1 11 '-8" 26'-6" 19.51 20.9 38'-2" 25.3 28.1 1 49'-10" 1 31.1 35.2 1 61 '-6" 1 36.9 42.4 1:8 Fl. Elev. TU RAILROAD BED BACKFILL MATERIAL BENEATH THE TRACK SHALL BE COMPACTED LIMEROCK. BACKFILL SHALL BE BROUGHT UP TO WITHIN 1.5' BELOW BOTT. OF EXISTING c.. _ s ci...... CORRUGATED METAL PIPE SECTION Y- Y DRAINAGE PIPE RELOCATION PI A A/ Note: 1. For concrete and corrugated metal pipes. 2. The top row of riprap bags shall be secured by pinning, using No. 4 reinforcing bars 18 inches in length, as follows: a. The end bogs shall be secured using two bars per bag, one vertical and one diagonal as shown. b. The next to last bag on each end shall be secured with two bars vertically. c. Bogs located over the pipe shall be secured by a bar which is driven diagonally except that for concrete pipe two bars shall be used for single bags above the pipe. d. Intermediate bogs shall be secured with a single bar. Bars shall be driven to one inch below the surface of the bag. The cost of fumishing and installing the bars shall be included in the cost of the riprap. FRONT ELEVATION A -A (PROPOSED CONSTRUCTION) Information for this detail taken from F.D.O. T. Roadway & Traffic Design Standards Index No. 258, Sht. 1 of 1. DESIGNED KWF DRAWN BVB CHECKED DATE.• 3123195 SHEET NO. 2 OF 2 EXISTING INVERT ELEVATIONS PIPE NO. 1 2 3 4 5 UPSTREAM INV. J. 12 5.38 5.56 5.57 5.49 DOWNSTREAM INV. 3.27 5.14 5.25 5.58 5.60 \,<\ BELOW CANAL G4 CANAL G5 `00 _ _ bedding preparation and )n of tracks to be done Fa East Coast Railway Fill dirt by City of Edgewater (Except where Limerock is eq'd. see Section B-B this sheets Proposed Inv. El. 1.8 (Upstream) & 1.7 (Downstream) CITY OF EDGEWATER ENGINEERING DEPARTMENT NO.1 DATE REVISION DESCRIPTION BY I REV. NO.1 DATE REVISION DESCRIPTION SCALE. NONE PROJECT NO.