GENERAL SPECIFICATIONS
1. No sitework or material fabrication shall be done prior to field
verification of dimensions and conditions by contractor. Any
discrepancies between field data and contract documents shall be
brought to the attention of the owner for resolution before
initiation of sitework and/or material fabrication as applicable.
2. Work at the site shall commence as early as possible on a Friday
as determined by City of Edgewater Public Works. The project
shall be complete by 8 AM of the second 'Monday following
commencement of work.
3. Performance bonus and penalty is applicable as follows:
Early completion - $200 for each 24 hours before 8 AM of
the second Monday following commencement.
Late completion - $200 for each 24 hours or portion thereof
beyond 8 AM of the second Monday following
commencement.
SITE WORK SPECIFICATIONS
1. Existing concrete slab and curb shall be removed and earth
excavated to a depth of 3 feet below bo# rn grade of new
concrete. The excavation shall extend 5 feet beyond the new
concrete area.
P20 Po5ED 12AM P ELEVA11ON5
5EE DETAI L�a SHT. 2
9.40
12 � I ✓ rV / I!W V
i
I-
� 1 i roo 13�►? i �,o�
�H �L. L., Poc I< FZAH F
T Im% A► I n r r n 0%T A Tr 1 0% IL. rE%1 A& 0
RAMP MODIFICATIONS
V\JP%L-L- ' 1 - I V
20129
Zn c�i5.1
5EE 5HT 2 F5:I2
Mari FIGAT10NS
TH l5 Alz EA
7,134
z 1 - d7
GONG s
7 e_
r
dw
` i
0
.�
iL
"`-
��
I � ,
i
,
. 1
1
r L
DA TE I REVISION DESCRIPTION I BY I 'Ain" I DATE
REVISION DESCRIPTION
BY
SuMP PIT
TOP EL. 7,44
F30T. E L. 3.2 B
dlyaz'l PPA I N 66
TROUGH WIG ATE
Sll -qo'o E5EH D all `IO° gEN D
INV, EL. INV. EL.
1°f.3 1q.3
Xf-
EA-paN IOW JOINT (TY P)
PVC P12A1 N PI PE (TYP)
22.q
22.4 22.4
n u �� Cp' CHAI N LI NK FENCE
12 X Cv P12A1 NAGE 22e5 CO GONG, CURE 5EE D�TAI L TH I cHT.
TI'O U G H WIG RATE M 23.0
22.5 22.5
23 O I I do CoWC. 5LA&
23. i 22.1v 23.1
22.E 22.Cv
ry .
• — • FILL- 5EE SECTION �ELDW
PARTIAL PLAN -PROPOSED MODIFICATIONS
SCALE: I°=10'
ioo tom zapTP. sc, too
SECTION -PROPOSED MODIFICATIONS
SCALE HORIZ. I"=10'
VE RT. I "= 2'
TRANSFER STATION MODIFICATIONS-
!GDC
DESIGNED JDM
DRAWN BV B
CHECKED J DM
—� SHEET NO. Z OF 4
Dare SEPT. 1992
SCALE. AS NOTED PROD. NO.
JOE-
ETA" o -f-cx0
&'CHAIN
LANK FENCE
EXPAN51OW
BO Lre
GONG. CURB
GONG. E51.A6
FENCE MOUNTING DETAIL
SCALE: 1"= I'-0"
25
20
1,57
CITY OF EDGEWATER,
FLORIDA
of
YW, V
A
• I ( /�6L I
A
I
� I I
I c�eo ss M 143ft —
I Avl5t,4& . I
I Z/F �Z. - Fo_eO Mffi!
TD Fi7', 3/re''A.36 I
�D X /� -O CHAR
I D 7 �IA16
I I
f I _
I
I (
Ito
3 %'ZL 5 I I I A
A— — — — — -�
,ears
0
�2"XL" �vle. /¢36
&-y-E W/cORMCR LIP
ZjAJ E- 7-4A)6,ri1r Tz> r1i5riW_5 Pt PE Cr�tvA4..s .
2l X2"X 5VA75W5A5 (9 Zo D C. t
V
T . PA1 CHC AV57ALL
// - � r"
16 Xn ISRAl..E _5AMIA/- ;rl ea-) /A)5M&
5 auT11 FLf073oV - A4bR7;V S11044 R
DATE REVISION DESCRIPTION I BY 'A10 I DATE I REVISION DESCRIPTION I BY
C1
A
Ire, f3ai'TTX�
00
a
1 ° 4Nv4
FzC�
9"X24�0�X�zf434�1
0
W
w
w
lloi,E 5/DE l>. �57-lAch-AM 4S 601/rrnE F,9& CLA1e/1l -- SEE fzr4T/oAl 4-4.
`S//DE rA?A/01- WfZ-DA4a]7' Z2E7Xi L - ,5no iy 51&WN - A&RTW SIMILAR .
TRANSFER STATION MODIFICATIONS
TI
m
Akr : Ems 7Z. 10( Si F)TEk 9- „S �_)A/ r7,FD _<4tr;7m/ A-4.
ryr ,d.
,CND of
/2'1
3/W'x�"Tor A3�
'//z''Lev,�NU 'z 1vS'4[.L
5iLzIcAl A -X ��A4z
STRUCTURAL STEEL/WELDING SPECIFICATIONS
1. All tubing is 4 inch 3/16 inch wall ASTM A500 Grade B. All
angles and plates are ASTM A36.
2. All welding shall be done in accordance with ANSI/AWS D1.1,
Structural Welding Code -Steel.
3. Fabrication and erection inspection shall be provided by the
contractor.
4. Verification inspection is waived.
5. All welds shall be 100 percent visually inspected by the
contractor.
6. All weld filler material is F7X-EXXX except E70XX may be used for
joining A36 material and attaching A36 material to A500 tubes.
7. Except where shown otherwise, all welds are complete joint
penetration single bevel groove welds.
DESIGNED I J D M
DRAWN J DM
� i CHECKED JDM
LI
NOT VAD YYITHO SHEET N0. 3 OF 4
EMBOSSED SEAL OF DATE. SEPT. 1992
ENGINEER SCALE: 4r A/O772) PROD. NO.
CITY OF EDGEWATER,
FLORIDA
REV.
NO.
DATE
REVISION DESCRIPTION
BY
REV.
NO.
DATE
REVISION DESCRIPTION
BY
121I W. X &" D. pRAI WAGE
T2oUCJH W/15 �" W, G�►TE
Q I� �� A I .-17 CTr_ — I n h"+ I ��
�IIIII —
I+ I L 5 E E 5 EGTI O W
5 H EET 2 *e5 Gd 12 I; E, W.
TRANSFE6_STATIQN MODIFICATIONS
4$5 co WT.
",'E5 1
*5 J LAP �2-411
q- g 1 Z I I, E.W. (TY P)
PARTIAL PLAN -RAMP Ek HOPPER
SCALE: 1/2" = I '- O"
DESIGNED I J DM
DRAWN BVB
CHECKED JDM
DATE; SEPT. 1992
SCALE: AS NOTED
,ol I I w I L I i i t i v 1�- I-- L r i- I--
r—, I — I . v F--%. r. v v I %�- L�- /'% I I vas L► LJ I- I I N ./ v v I L- L.- LJL�- V G I I-� I'R 1- I I 1 r G W
AFTEIZ 1ZF,"OVAL o 1:::"- EXIT. SLAD + GuRj?;o